Operational and Structural Risks

Sempra’s cash flows, ability to pay dividends and ability to meet its debt obligations largely depend on the performance of its subsidiaries and entities accounted for as equity method investments.

unchangedConcentration

We are a holding company and substantially all our assets are owned by our subsidiaries or entities we do not control, including equity method investments. Our ability to pay dividends and meet our debt and other obligations largely depends on cash flows from our subsidiaries and equity method investments, which in turn depend on their ability to execute their business strategies and generate cash flows in excess of their own expenditures, dividend payments to third-party owners (if any) and debt and other obligations. In addition, entities accounted for as equity method investments, which we do not control, and our subsidiaries are all separate and distinct legal entities that are not obligated to pay dividends or make loans or distributions to us and could be precluded from doing so by legislation, regulation, court order or contractual restrictions, in times of financial distress or in other circumstances.

The inability to access capital from our subsidiaries and entities accounted for as equity method investments could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

Sempra’s rights to the assets of its subsidiaries and equity method investments are structurally subordinated to the claims of each entity’s trade and other creditors. If Sempra is a creditor of any such entity, its rights as a creditor would be effectively subordinated to any security interest in the entity’s assets and any indebtedness of the entity senior to that held by Sempra. In addition, Sempra may elect to make capital contributions to its subsidiaries, which are not required to be repaid and generally are structurally subordinated to claims by creditors of the applicable subsidiary.

Sempra has substantial investments in and obligations arising from businesses it does not control or manage or in which it shares control.

rewrittenConcentrationBroadened language on non-controlled investments to emphasize potential liabilities and capital contribution obligations during financial distress; removed specific reference to ownership sales.

We have investments in businesses we do not control or manage or in which we share control. In some cases, we engage in arrangements with or for these businesses that could expose us to risks in addition to our investment, including guarantees, indemnities and loans. For businesses we do not control, we are subject to the decisions of others, which may not always be in our interest and could negatively affect us. When we share control of a business with other owners, any disagreements among the owners about strategy, financial, operational, transactional or other important matters could hinder the business from moving forward with key initiatives or taking other actions and could negatively affect the relationships among the owners and the efficient functioning of the business.

In addition, irrespective of whether or not we control these businesses, we could be responsible for liabilities or losses related to these businesses or elect to make capital contributions to these businesses. Any such circumstance could materially adversely affect our results of operations, financial condition, cash flows and/or prospects. We discuss these investments in Note 6 of the Notes to Consolidated Financial Statements.

Compare with the 2022 10-K

Prior heading: Sempra has substantial investments in and obligations arising from businesses it does not control or manage or in which it shares control.

We have and make investments in businesses we do not control or manage or in which we share control, including as a result of sales of a portion of our ownership interest in some of our businesses. control. In some cases, we engage in arrangements with or for these businesses that could expose us to risks in addition to our investment, including guarantees, indemnities and loans. For businesses we do not control, we are subject to the decisions of others, which may not always be in our interest and could negatively affect us. In addition, irrespective of whether or not we control these businesses, we could be responsible for liabilities or losses related to the businesses or elect to make capital contributions to these businesses during times of financial distress that could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. We discuss these investments further in Notes 5, 6 and 16 of the Notes to Consolidated Financial Statements. When we share control of a business with other owners, any disagreements among the owners about strategy, financial, operational, transactional or other important matters could hinder the business from moving forward with key initiatives or taking other actions and could negatively affect the relationships among the owners and the efficient functioning of the business. In addition, irrespective of whether or not we control these businesses, we could be responsible for liabilities or losses related to these businesses or elect to make capital contributions to these businesses. Any such circumstance could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.prospects. We discuss these investments in Note 6 of the Notes to Consolidated Financial Statements.

Added · Removed · word-level comparison of the two filings

Our business could be negatively affected by activist shareholders.

unchangedOther

Activist shareholders may engage in proxy solicitations, advance shareholder proposals or otherwise attempt to effect changes in or assert influence on our board of directors and management. In taking these steps, activist shareholders could seek to acquire our capital stock, which at certain ownership levels could threaten our ability to use some or all our NOL carryforwards if our corporation experiences an “ownership change” under applicable tax rules. Responding to activist shareholders could require us to incur legal and advisory fees, proxy solicitation expenses and administrative and associated costs and require time and attention by our board of directors and management, diverting their attention from the pursuit of our business strategies.

Any perceived uncertainties about our future direction or control, our ability to execute our strategies, or the composition of our board of directors or management team arising from activist shareholder attention or other action could lead to a perception of instability or a change in the direction of our business, which could be exploited by our competitors and/or other activist shareholders, result in the loss of business opportunities, and make it more difficult to pursue our strategic initiatives or attract and retain qualified personnel and business partners, any of which could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. Further, any such actions could cause fluctuations in the trading prices of our securities based on temporary or speculative market perceptions or other factors.

Financial and Capital Stock-Related Risks

Any impairment of our assets or investments could negatively impact us.

unchangedOther

We could experience a reduction in the fair value of our assets, including our long-lived assets, intangible assets or goodwill, and/or our investments that we account for under the equity method upon the occurrence of many of the risks discussed in these risk factors and elsewhere in this report, including any closure of the Aliso Canyon natural gas storage facility without adequate cost recovery, any inability to operate our existing facilities or develop new projects in Mexico due to proposed changes to existing laws or regulations or other circumstances affecting the energy sector or our assets in that country, and more generally any loss of permits or approvals that requires us to adjust or cease certain operations and any investment in capital projects that do not receive required approvals or are changed, abandoned or otherwise not completed.

Any such reduction in the fair value of our assets or investments could result in an impairment loss that could materially adversely affect our results of operations for the period in which the charge is recorded. We discuss our impairment testing of long-lived assets and goodwill and the factors considered in such testing in “Part II – Item 7. MD&A – Critical Accounting Estimates” and in Note 1 of the Notes to Consolidated Financial Statements.

The economic interest, voting rights and market value of our outstanding common and preferred stock may be adversely affected by any additional equity securities we may issue.

unchangedOther

At February 21, 2023, we had 314,569,519 shares of our common stock and 900,000 shares of our non-convertible series C preferred stock outstanding. We may seek to raise capital by issuing additional equity or convertible debt securities, which may materially dilute the voting rights and economic interests of holders of our outstanding common and preferred stock and materially adversely affect the trading price of our common and preferred stock.

Dividend requirements associated with our preferred stock subject us to risks.

unchangedCredit & liquidity

Any failure to pay scheduled dividends on our series C preferred stock when due would have a material adverse impact on the market price of our securities and would prohibit us, under the terms of the series C preferred stock, from paying cash dividends on or repurchasing shares of our common stock (subject to limited exceptions) until we have paid all accumulated and unpaid dividends on the series C preferred stock. Additionally, the terms of the series C preferred stock generally provide that if dividends on any shares of the preferred stock have not been declared and paid or have been declared but not paid for three or more semi-annual dividend periods, whether or not consecutive, the holders of the preferred stock would be entitled to elect two additional members to our board of directors, subject to certain terms and limitations.

Our common stock is listed on the Mexican Stock Exchange and registered with the CNBV, which subjects us to additional regulation and liability in Mexico.

unchangedRegulatory

In addition to being listed for trading on the NYSE, our common stock is listed for trading on the Mexican Stock Exchange and registered with the CNBV. Such listing and registration subjects us to filing and other requirements in Mexico that could increase costs and increase performance risk of personnel given additional responsibilities. In addition, the CNBV, as the Mexican securities market regulator, has the authority to make inspections of Sempra’s business, primarily in the form of requests for information and documents; impose fines or other penalties on Sempra and its directors and officers for violations of Mexican securities laws and regulations; and seek criminal liability for certain actions conducted or with effects in Mexico. The occurrence of any of these risks could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

RISKS RELATED TO ALL SEMPRA BUSINESSES

Our businesses are subject to risks arising from their infrastructure and information systems.

rewrittenSupply chainAdded supply chain constraints, tight labor market, inflationary cost pressures, third-party contractor risks, and property rights/permit retention risks; removed prior specific facility type enumeration.

Our businesses’ facilities and the information systems that interconnect and/or manage them are subject to risks of, among other things, potential breakdown or failure of equipment or processes due to aging infrastructure and systems; human error; shortages of or delays in obtaining equipment, materials, commodities or labor, which may be exacerbated by current or future supply chain constraints and tight labor market conditions, and increases to the costs of these items due to inflationary pressures or otherwise, which may not be recoverable in a timely manner or at all; operational restrictions resulting from environmental requirements or governmental interventions; inability to enter into, maintain, extend or replace long-term supply or transportation contracts; and performance below expected levels.

Even though our businesses undertake capital investment projects to construct, replace, maintain, improve and upgrade facilities and systems, such projects may not be effective at managing the aforementioned risks, and may involve significant costs that may not be recoverable and challenges in achieving completion. We often rely on third parties, including contractors, to perform work related to these projects and other maintenance activities, which may subject us to increased risks because we manage the safety and quality of work performed by third parties and may retain liability for their work. Because our facilities are interconnected with those of third parties, including receiving natural gas supply from third party pipelines and power generation facilities that produce most of the power that we distribute to customers, the operation of our facilities could also be adversely affected by these or similar risks to the systems of such third parties, many of which may be unanticipated or uncontrollable by us.

Additional risks associated with our businesses’ ability to safely and reliably construct, replace, operate, maintain, improve and upgrade their respective facilities and systems, many of which are beyond our control, include:

▪failure to meet customer demand for electricity and/or natural gas, including electrical blackouts or curtailments or gas outages ▪natural gas surges into homes or other properties ▪the release of hazardous or toxic substances, including gas leaks ▪inadequate emergency preparedness plans and the failure to respond effectively to catastrophic events The occurrence of any of these events could affect supply and demand for electricity, natural gas or other forms of energy, cause unplanned outages, damage our businesses’ assets and/or operations, damage the assets and/or operations of third parties on which our businesses rely, damage property owned by customers or others, and cause personal injury or death. In addition, if we are unable to defend and retain title to the properties we own or if we are unable to obtain or retain rights to construct and operate on the properties we do not own in a timely manner, on reasonable terms or at all, we could lose our rights to occupy and use these properties and the related facilities, which could result in modification, delay or curtailment of existing or proposed operations or projects, increase our costs, and result in breaches of one or more permits or contracts related to the affected facilities that could lead to legal costs, impairments or fines or penalties. Any such outcome could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

Compare with the 2022 10-K

Prior heading: Our businesses are subject to risks arising from their infrastructure and information systems.

Our businesses own and operate electric transmission, distribution and storage facilities, natural gas transmission, distribution, regasification, liquefaction and storage businesses’ facilities and other energy infrastructure, which are, in many cases, interconnected and/or managed by the information technology systems. Even though our businesses undertake capital investment projects systems that interconnect and/or manage them are subject to construct, replace, maintain, improve and upgrade their respective facilities and information systems, there is a risk risks of, among other things, potential breakdown or failure of equipment or processes due to aging infrastructure and systems; human error; shortages of or delays in obtaining equipment, materials materials, commodities or labor; labor, which may be exacerbated by current or future supply chain constraints and tight labor market conditions, and increases to the costs of these items due to inflationary pressures or otherwise, which may not be recoverable in a timely manner or at all; operational restrictions resulting from environmental requirements or governmental interventions; inability to enter into, maintain, extend or replace long-term supply or transportation contracts; and performance below expected levels, and these risks could be amplified while levels. Even though our businesses undertake capital investment projects are to construct, replace, maintain, improve and upgrade facilities and systems, such projects may not be effective at managing the aforementioned risks, and may involve significant costs that may not be recoverable and challenges in process. achieving completion. We often rely on third parties, including contractors, to perform work related to these projects and other maintenance activities, which may subject us to increased risks because we manage the safety and quality of work performed by third parties and may retain liability for their work. Because our transmission facilities are interconnected with those of third parties, including receiving natural gas supply from third party pipelines and power generation facilities that produce most of the power that we distribute to customers, the operation of our facilities could also be adversely affected by these or similar events occurring on risks to the systems of such third parties, some many of which may be unanticipated or uncontrollable by us. Additional risks associated with the ability of our businesses businesses’ ability to safely and reliably construct, replace, operate, maintain, improve and upgrade their respective facilities and systems, many of which are beyond our businesses’ control, include: ▪failure to meet customer demand for electricity and/or natural gas, including electrical blackout, blackouts or curtailments or gas outages ▪natural gas surges into homes or other properties ▪the release of hazardous or toxic substances into the air, water or soil, substances, including gas leaks ▪inadequate emergency preparedness plans and the failure to respond effectively to catastrophic events The occurrence of any of these events could affect supply and demand for electricity, natural gas or other forms of energy, cause unplanned outages, damage our businesses’ assets and/or operations, damage the assets and/or operations of third parties on which our businesses rely, damage property owned by customers or others, and cause personal injury or death. In addition, if we are unable to defend and retain title to the properties we own or if we are unable to obtain or retain rights to construct and operate on the properties we do not own in a timely manner, on reasonable terms or at all, we could lose our rights to occupy and use these properties and the related facilities, which could result in modification, delay or curtailment of existing or proposed operations or projects, increase our costs, and result in breaches of one or more permits or contracts related to the affected facilities that could lead to legal costs, impairments or fines or penalties. Any such outcome could materially adversely affect have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

Added · Removed · word-level comparison of the two filings

Severe weather, natural disasters and other similar events could materially adversely affect us.

unchangedClimate & physical

Our facilities and infrastructure, including projects in development and under construction, may be damaged by severe weather, natural disasters, accidents, explosions or acts of terrorism, war or criminality. Because we are in the business of using, storing, transporting and disposing of highly flammable, explosive and radioactive materials and operating highly energized equipment, the risks such incidents may pose to our facilities and infrastructure, as well as the risks to the surrounding communities for which we could be held responsible, are substantially greater than the risks such incidents pose to a typical business.

Such incidents could result in business and project development disruptions, power or gas outages, property damage, injuries and loss of life for which we could be liable and could cause secondary incidents that also may have these or other negative effects, such as fires; leaks of natural gas, natural gas odorant, propane, ethane, other GHG emissions or radioactive material; spills or other damage to natural resources; or other nuisances to affected communities. Any of these occurrences could decrease revenues and earnings and/or increase costs, including maintenance costs or restoration expenses, amounts associated with claims against us, and regulatory fines, penalties and disallowances. In some cases, we may be liable for damages even though we are not at fault, such as when the doctrine of inverse condemnation applies, which we discuss below under “Risks Related to Sempra California – Operational Risks.”

For our regulated utilities, these costs may not be recoverable in rates. Insurance coverage for these costs may increase or become prohibitively expensive, be disputed by insurers, or become unavailable for certain of these risks or at sufficient levels, and any insurance proceeds may be insufficient to cover our losses or liabilities due to limitations, exclusions, high deductibles, failure to comply with procedural requirements or other factors. Such incidents that do not directly affect our facilities may impact our business partners, supply chains and transportation channels, which could negatively impact construction projects and our ability to provide electricity and natural gas to customers. Moreover, weather-related incidents have become more prevalent, unpredictable and severe as a result of climate change or other factors, which could have a greater impact on our businesses than currently anticipated and, for our regulated utilities, rates may not be adequately or timely adjusted to reflect any such increased impact. Any such outcome could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

In addition to general information and cyber risks that all large corporations face, we face evolving cybersecurity risks associated with the energy grid, natural gas pipelines, storage and other infrastructure and protecting sensitive and confidential customer and employee information.

rewrittenCyber & dataEnhanced cybersecurity risk to specify energy and gas market data collection, energy efficiency/demand response programs, and state/country privacy law adoption.

Our use of complex technologies and systems in our operations, including deployment of any new technologies, and our collection and retention of sensitive information, represent large-scale opportunities for attacks on or other failures to protect our information systems, confidential information and energy grid and natural gas infrastructure. In particular, cyber-attacks targeting utility systems and other energy infrastructure, as well as the impacts of these attacks on companies and their communities, are increasing in sophistication, magnitude and frequency and may further increase in connection with certain geopolitical events, such as the war in Ukraine. Additionally, SDG&E and SoCalGas are increasingly required to disclose large amounts of data (including customer personal information and energy use data) to support changes to California’s electricity and gas markets related to grid modernization and customer choice as well as energy efficiency, demand response and conservation, increasing the risks of inadvertent disclosure or other unauthorized access of sensitive information.

Further, the virtualization of many business activities increases cyber risk, and generally there has been an associated increase in targeted cyber-attacks. Moreover, all our businesses operating in California (and any other states and countries where we do business that adopt similar laws) are subject to enhanced state privacy laws, which require companies that collect information about California residents to, among other things, make disclosures to consumers about their data collection, use and sharing practices; allow consumers to opt out of certain data sharing with third parties; and assume liability under a new cause of action for unauthorized disclosure of certain highly sensitive personal information.

Although we invest in risk management and information security measures for the protection of our systems and information, these measures could be insufficient or otherwise fail. The costs and operational consequences of implementing, maintaining and enhancing these protection measures are significant, and they could materially increase to address increasingly intense and complex cyber risks. We often rely on third-party vendors to deploy new business technologies and maintain, modify and update our systems, and these third parties may not have adequate risk management and information security measures with respect to their systems. Any cyber-attack, including ransomware attacks, on our or our vendors’ information systems or the integrity of the energy grid, our pipelines or our distribution, storage and other infrastructure, or unauthorized access, damage or improper disclosure of confidential information, could result in disruptions to our business operations, regulatory compliance failures, inabilities to produce accurate and timely financial statements, energy delivery failures, financial and reputational loss, customer dissatisfaction, litigation, violation of privacy laws and fines or penalties, any of which could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

Although Sempra currently maintains cyber liability insurance, this insurance is limited in scope and subject to exceptions, conditions and coverage limitations and may not cover any or even a substantial portion of the costs associated with any compromise of our information systems or confidential information, and there is no guarantee that the insurance we currently maintain will continue to be available at rates we believe are commercially reasonable.

Compare with the 2022 10-K

Prior heading: In addition to general information and cyber risks that all large corporations face, we face evolving cybersecurity risks associated with protecting sensitive and confidential customer and employee information and energy grid, natural gas pipeline, storage and other infrastructure.

Our businesses collect and retain sensitive information, including personal identification information about customers and employees, and our operations rely on complex, interconnected networks use of generation, transmission, distribution, storage, control, and communication complex technologies and systems. Our use of business technologies, systems in our operations, including deployment of any new technologies, represents a and our collection and retention of sensitive information, represent large-scale opportunity opportunities for attacks on or other failures to protect our information systems, confidential information and energy grid and natural gas infrastructure. In particular, cyber- and other attacks cyber-attacks targeting utility systems and other energy infrastructures, infrastructure, as well as the impacts of these attacks on companies and their communities, are increasing in sophistication, magnitude and frequency and may further increase in the event of connection with certain geopolitical events and other uncertainties, events, such as the conflict war in Ukraine. Additionally, SDG&E and SoCalGas are increasingly required to disclose large amounts of data (including customer energy usage and personal information about customers) and energy use data) to support changes to California’s electricity market and gas markets related to grid modernization and customer choice, choice as well as energy efficiency, demand response and conservation, increasing the risks of inadvertent disclosure or other unauthorized access of sensitive information. Further, the virtualization of many business activities during the COVID-19 pandemic increases cyber risk, and generally there has been an associated increase in targeted cyber-attacks. Moreover, all our businesses operating in California (and any other states and countries where we do business that adopt similar laws) are subject to enhanced state privacy laws, which require companies that collect information about California residents to, among other things, make disclosures to consumers about their data collection, use and sharing practices; allow consumers to opt out of certain data sharing with third parties; and be liable assume liability under a new cause of action for breaches unauthorized disclosure of certain highly sensitive personal information, and other states in which we do business could adopt similar laws. information. Although we invest in risk management and information security measures for the protection of our systems and information, these measures could be insufficient or otherwise fail. The costs and operational consequences of implementing, maintaining and enhancing these protection measures are significant, and they could materially increase to address increasingly intense and complex cyber risks. We often rely on third-party vendors to deploy new business technologies and maintain, modify and update our systems, and these third parties may not have adequate risk management and information security measures with respect to their systems. Any cyber-attack, including ransomware attacks, on our or our vendors’ information systems or the integrity of the energy grid, our pipelines or our distribution, storage and other infrastructure, or unauthorized access, damage or improper disclosure of confidential information, could result in disruptions to our business operations, regulatory compliance failures, inabilities to produce accurate and timely financial statements, energy delivery failures, financial and reputational loss, customer dissatisfaction, litigation, violation of privacy laws and fines or penalties, any of which could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. Although Sempra currently maintains cyber liability insurance, this insurance is limited in scope and subject to exceptions, conditions and coverage limitations and may not cover any or even a substantial portion of the costs associated with any compromise of our information systems or confidential information, and there is no guarantee that the insurance we currently maintain will continue to be available at rates we believe are commercially reasonable.

Added · Removed · word-level comparison of the two filings

We seek growth opportunities in the market organically and inorganically, including through the acquisition of, or partnerships in, operating companies.

rewrittenOtherRemoved specific mention of integration difficulties and earnings/cost savings targets from acquisition risk language.

We diligently analyze the financial viability of each acquisition, partnership and JV we pursue. However, our diligence may prove to be insufficient and there could be latent, unforeseen defects. In addition, we may not realize all the anticipated benefits from future acquisitions, partnerships or JVs for various reasons, including difficulties integrating operations and personnel to our standards or in a timely manner, higher and unexpected acquisition and operating costs, unknown liabilities, and fluctuations in markets. Any of these outcomes could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Compare with the 2022 10-K

Prior heading: We seek growth opportunities in the market organically and inorganically, including through the acquisition of, or partnerships in, operating companies.

We diligently analyze the financial viability of each acquisition, partnership and JV we pursue. However, our diligence may prove to be insufficient, insufficient and there could be difficulties in integrating acquired assets to our standards or in a timely manner or latent latent, unforeseen defects. In addition, we may not realize all of the anticipated benefits from future acquisitions, partnerships or JVs such as increased earnings, cost savings, or revenue enhancements, for various reasons, including difficulties integrating operations and personnel, personnel to our standards or in a timely manner, higher and unexpected acquisition and operating costs, unknown liabilities, and fluctuations in markets. Any of these outcomes could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Added · Removed · word-level comparison of the two filings

Increasing activities and projects intended to advance new energy technologies could introduce new risks to our businesses.

rewrittenRegulatoryAdded disclosure of federal and state funding pursuit for new energy technology projects, including compliance requirements and employee time demands.

We regularly undertake or become involved in research and development projects and other activities designed to develop new technologies in the energy space, including those related to hydrogen, energy storage, carbon sequestration, grid modernization and others. These activities and projects can involve significant employee time, as well as substantial capital resources that may not be recoverable in rates or, with respect to our non-regulated utility businesses, may not be able to be passed through to customers. We may also seek a variety of federal and state funding opportunities for these activities and projects (such as loans and grants, including in conjunction with third-party commercial or governmental entities), which may involve significant employee time and effort and increased compliance requirements with no guarantee that any such funding would be received.

In addition, the timing to complete these activities and projects is inherently uncertain and may require significantly more time and funding than we initially anticipate. Moreover, many of these technologies are in the early stage of development, and the applicable activities and projects may not be completed or the applicable technologies may not prove economically and technically feasible. If any of these circumstances occurs, we may not receive an adequate or any return on our investment and other resources invested in these activities and our results of operations, financial condition, cash flows and/or prospects could be materially adversely affected.

Compare with the 2022 10-K

Prior heading: Increasing activities and projects intended to advance new energy technologies could introduce new risks to our businesses.

We may periodically regularly undertake or become involved in research and development projects and other activities designed to develop new technologies in the energy space, including those related to hydrogen, energy storage, carbon sequestration, grid modernization and others. These activities and projects can involve significant employee time, as well as substantial capital resources that may not be recoverable in rates or, with respect to our non-regulated utility businesses, may not be able to be passed through to customers. We may also seek a variety of federal and state funding opportunities for these activities and projects (such as loans and grants, including in conjunction with third-party commercial or governmental entities), which may involve significant employee time and effort and increased compliance requirements with no guarantee that any such funding would be received. In addition, the timing to complete these activities and projects is inherently uncertain and may require significantly more time and funding than we initially anticipate. Moreover, many of these technologies are in the early stage of development, and the applicable activities and projects may not be completed or the applicable technologies may not prove economically and technically feasible. If any of these circumstances occurs, we may not recover or receive an adequate or any return on our investment and other resources invested in these activities and our results of operations, financial condition, cash flows and/or prospects could be materially adversely affected.

Added · Removed · word-level comparison of the two filings

The operation of our facilities depends on good labor relations with our employees.

unchangedLabor & talent

Several of our businesses have in place collective bargaining agreements with different labor unions, which are generally negotiated on a company-by-company basis. Any failure to negotiate and reach an agreement on these labor contracts as they are up for renewal could result in strikes, boycotts or other labor disruptions. Any such labor disruption or negotiated wage or benefit increases, whether due to union activities, employee turnover or otherwise, could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

Our businesses depend on the performance of counterparties, and any performance failures by these counterparties could materially adversely affect us.

unchangedCredit & liquidity

Our businesses depend on the performance of business partners, customers, suppliers and other counterparties who owe money or commodities as a result of market transactions or other long-term arrangements. If they fail to perform their obligations in accordance with these arrangements, we may need to enter into alternative arrangements or honor our underlying commitments at then-current market prices, which may result in additional losses to us to the extent of amounts already paid to such counterparties. Any efforts to enforce the terms of these arrangements through legal or other means could involve significant time and costs and would be unpredictable and may not be successful. In addition, many of these arrangements, including our relationships with the applicable counterparties, are important for the conduct and growth of our businesses.

We also may not be able to secure replacement agreements with other counterparties on favorable terms, in a timely manner or at all if any of these arrangements terminate. Further, we often extend credit to customers and other counterparties and, although we perform credit analyses prior to extending credit, we may not be able to collect the amounts owed to us, which presents an increased risk for our long-term supply, sales and capacity contracts. The failure of any of our counterparties to perform in accordance with their arrangements with us could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Sempra Infrastructure’s obligations and those of its LNG suppliers are contractually subject to suspension or termination for force majeure events, which generally are beyond the control of the parties, and limitations of remedies for other failures to perform, including limitations on damages that may prohibit recovery of costs incurred for any breach of an agreement. Any such occurrence could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

Sempra Infrastructure engages in JVs and invests in companies in which other equity partners may have or share with us control over the applicable project or investment. Sempra Texas Utilities also invests in companies that it does not control or manage. We discuss the risks related to these arrangements above under “Risks Related to Sempra – Operational and Structural Risks.”

Our businesses face risks related to the COVID-19 pandemic.

rewrittenClimate & physicalNarrowed COVID-19 risk disclosure by removing details on vaccination protocols, work modifications, and operational disruption impacts; retained pandemic references.

The COVID-19 pandemic has materially impacted communities, supply chains, economies and markets around the world since March 2020. To date, the COVID-19 pandemic has not had a material impact on our results of operations. However, Sempra and some or all its businesses have been and could continue to be impacted by this pandemic or any future pandemic in a number of ways, including:

▪Disruption in supply chains and the capital markets, which has affected and could further affect liquidity, strategic initiatives and prospects, including in some cases a slowdown of planned capital spending ▪Customer-protection measures implemented by SDG&E and SoCalGas, including suspending service disconnections due to nonpayment for all customers early in the pandemic (except for SoCalGas’ noncore customers and, since the second half of 2022, SDG&E’s and SoCalGas’ commercial and industrial customers), waiving late payment fees, offering flexible payment plans and automatically enrolling residential and small business customers with past-due balances in long-term repayment plans, which have collectively resulted in a reduction in payments from SDG&E and SoCalGas’ customers and an increase in uncollectible accounts that could become material and may not be fully recoverable ▪Precautionary, preemptive and responsive actions taken by our current and prospective counterparties, customers and partners, as well as regulators and other governing bodies that affect our businesses, which have affected and could further affect our operations, results, liquidity and ability to pursue capital projects and strategic initiatives Any of these impacts could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

We will continue to actively monitor the effects of the COVID-19 pandemic and may take further actions that alter our business operations as may be required by federal, state or local authorities, or that we determine are necessary for the safety of our employees, customers, partners and suppliers and, generally, the communities we serve. However, we cannot at this time predict the extent to which the COVID-19 pandemic may further impact our businesses.

Compare with the 2022 10-K

Prior heading: Our businesses face risks related to the COVID-19 pandemic.

The COVID-19 pandemic has been materially impacting impacted communities, supply chains, economies and markets around the world since March 2020. To date, the COVID-19 pandemic has not had a material impact on our results of operations. However, Sempra and some or all its businesses have been and could continue to be impacted by this pandemic or any future pandemic in a number of ways, including: ▪Implementing protocols and processes to comply with applicable government mandates related to virus exposure, testing and vaccination ▪Conducting business with substantial modifications to employee travel and work locations and virtualization of certain business activities, which could result in increased employee turnover or absenteeism, decreased efficiency and productivity and other similar affects that could increase operating costs and jeopardize our ability to satisfy compliance requirements and sustain operations ▪Disruption in supply chains and the capital markets, which has affected and could further affect liquidity, strategic initiatives and prospects, including in some cases a slowdown of planned capital spending ▪Customer-protection measures implemented by SDG&E and SoCalGas, including suspending service disconnections due to nonpayment for all customers early in the pandemic (except for SoCalGas’ noncore customers and, since the second half of 2022, SDG&E’s and SoCalGas’ commercial and industrial customers), waiving late payment fees, offering flexible payment plans and automatically enrolling residential and small business customers with past-due balances in long-term repayment plans, which have collectively resulted in a reduction in payments from SDG&E and SoCalGas’ customers and an increase in uncollectible accounts that could become material and may not be fully recoverable ▪Precautionary, preemptive and responsive actions taken by our current and prospective counterparties, customers and partners, as well as regulators and other governing bodies that affect our businesses, which have affected and could further affect our operations, results, liquidity and ability to pursue capital projects and strategic initiatives Any of these impacts could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. We will continue to actively monitor the effects of the COVID-19 pandemic and may take further actions that alter our business operations as may be required by federal, state or local authorities, or that we determine are necessary for the safety of our employees, customers, partners and suppliers and, generally, the communities we serve. However, we cannot at this time predict the extent to which the COVID-19 pandemic may further impact our businesses.

Added · Removed · word-level comparison of the two filings

Our debt service obligations expose us to risks and could require additional equity securities issuances by Sempra and sales of equity interests in various subsidiaries or projects under development.

rewrittenCredit & liquidityExpanded debt service risk to explicitly include equity sales in subsidiaries and development projects, plus interest rate increase impacts.

Our businesses have debt service obligations, which could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects by, among other things:

▪making it more difficult and costly for each of these businesses to service, pay or refinance their debts as they come due, particularly during adverse economic or industry conditions or in periods of significant increases in interest rates ▪limiting flexibility to pursue strategic opportunities or react to business developments or changes in the industry sectors in which they operate ▪requiring cash to be used for debt service payments, thereby reducing the cash available for other purposes ▪causing lenders to require materially adverse terms in the instruments for new debt, such as restrictions on uses of proceeds or other assets or limitations on incurring additional debt, creating liens, paying dividends, repurchasing stock, making investments or receiving distributions from subsidiaries or equity method investments Sempra’s goal is to maintain or improve its credit ratings, but it may not be able to do so.

To maintain these credit ratings, we may seek to reduce our outstanding indebtedness or our need for additional indebtedness with the proceeds from issuances of equity securities by Sempra or the sale of equity interests in our subsidiaries or development projects. We may not be able to complete any such equity sales on terms we consider acceptable or at all, and any new equity issued by Sempra may dilute the voting rights and economic interests of existing holders of Sempra’s common and preferred stock. Any such outcome could have a material adverse effect on Sempra’s results of operations, financial condition, cash flows and/or prospects.

Compare with the 2022 10-K

Prior heading: Our debt service obligations expose us to risks, and with respect to Sempra, could require additional equity securities issuances.

Our businesses have debt service obligations, which could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects by, among other things: ▪making it more difficult and costly for each of these businesses to service, pay or refinance their debts as they become come due, particularly during adverse economic or industry conditions or in periods of significant increases in interest rates ▪limiting flexibility to pursue strategic opportunities or react to business developments or changes in the industry sectors in which they operate ▪requiring cash to be used for debt service payments, thereby reducing the cash available for other purposes ▪causing lenders to require materially adverse terms in the instruments for new debt, such as restrictions on uses of proceeds or other assets or limitations on incurring additional debt, creating liens, paying dividends, repurchasing stock, making investments or receiving distributions from subsidiaries or equity method investments Sempra’s goal is to maintain or improve its credit ratings, but it may not be able to do so. To maintain these credit ratings, we may seek to reduce our outstanding indebtedness or our need for additional indebtedness with the proceeds from issuances of equity securities. securities by Sempra or the sale of equity interests in our subsidiaries or development projects. We may not be able to complete any such equity issuances sales on terms we consider acceptable or at all, and any new equity we do issue issued by Sempra may dilute the voting rights and economic interests of existing holders of Sempra’s common and/or and preferred stock. Any such outcome could have a material adverse effect on Sempra’s results of operations, financial condition, cash flows and/or prospects.

Added · Removed · word-level comparison of the two filings

The availability and cost of debt or equity financing could be negatively affected by market and economic conditions and other factors, and any such effects could materially adversely affect us.

unchangedCredit & liquidity

Our businesses are capital-intensive, with significant capital spending expected in future periods. In general, we rely on long-term debt to fund a significant portion of our capital expenditures and repay outstanding debt and we rely on short-term borrowings to fund a significant portion of day-to-day business operations. Sempra may also seek to raise capital by issuing equity or selling equity interests in our subsidiaries or investments.

Limitations on the availability of credit, increases in interest rates or credit spreads due to inflationary pressures or otherwise or other negative effects on the terms of any financing we pursue could cause us to fund operations and capital expenditures at a higher cost or fail to raise our targeted amount of funding, which could negatively impact our ability to meet contractual and other commitments, progress development projects, make non-safety related capital expenditures and effectively sustain operations. Any of these outcomes could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

In addition to market and economic conditions, factors that can affect the availability and cost of capital include:

▪adverse changes to laws and regulations, including recent and proposed changes to the regulation of the energy market in Mexico ▪the overall health of the energy industry ▪volatility in electricity or natural gas prices ▪for Sempra, SDG&E and SoCalGas, risks related to California wildfires ▪for Sempra, SDG&E and SoCalGas, any deterioration of or uncertainty in the political or regulatory environment for local natural gas distribution companies operating in California ▪credit ratings downgrades

We are subject to risks due to uncertainty relating to the calculation of LIBOR and its scheduled discontinuance.

unchangedCredit & liquidity

Certain of our financial and commercial agreements, including those for variable rate indebtedness, as well as interest rate derivatives, incorporate LIBOR as a benchmark for establishing certain rates. As directed by the U.S. Federal Reserve, banks ceased making new LIBOR-based issuances at the end of 2021, and publication of certain key U.S. dollar LIBOR tenors for existing loans is expected to cease in mid-2023. These events could cause LIBOR to perform differently than it has performed historically. Use of the SOFR, which has been identified as the replacement benchmark rate for LIBOR, may result in interest payments that are higher than expected or that do not otherwise correlate over time with the payments that would have been made using LIBOR.

Changes to or the discontinuance of LIBOR, any uncertainty regarding such changes or discontinuance, and the performance and characteristics of alternative benchmark rates, could negatively affect our existing and future variable rate indebtedness and interest rate hedges and the cost of doing business under our commercial agreements that incorporate LIBOR, SOFR or other alternative benchmark rates, and could require us to seek to amend the terms of the relevant indebtedness or agreements, which may not be possible and/or may require us to accept terms that are materially worse than existing terms. The occurrence of any of these risks could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

Credit rating agencies may downgrade our credit ratings or place those ratings on negative outlook.

unchangedCredit & liquidity

Credit rating agencies routinely evaluate Sempra, SDG&E, SoCalGas and SI Partners and certain of our other businesses, and their ratings are based on a number of factors, including the factors described below and the ability to generate cash flows; level of indebtedness; overall financial strength; specific transactions or events, such as share repurchases and significant litigation; the status of certain capital projects; and the state of the economy and our industry generally. These credit ratings could be downgraded or other negative credit rating actions could occur at any time. We discuss these credit ratings in “Part II – Item 7. MD&A – Capital Resources and Liquidity.”

For Sempra, the Rating Agencies have noted that the following events, among others, could lead to negative ratings actions:

▪expansion of natural gas liquefaction projects or other unregulated businesses in a manner inconsistent with its present level of credit quality ▪Sempra’s consolidated financial measures do not improve, or it fails to meet certain financial credit metrics ▪catastrophic wildfires caused by SDG&E or by any California electric IOUs that participate in the Wildfire Fund, which could exhaust the fund considerably earlier than expected For SDG&E, the Rating Agencies have noted that the following events, among others, could lead to negative ratings actions:

▪catastrophic wildfires caused by SDG&E or by any California electric IOUs that participate in the Wildfire Fund, which could exhaust the fund considerably earlier than expected ▪a consistent weakening of SDG&E’s financial metrics or a deterioration in the regulatory environment ▪a ratings downgrade at Sempra For SoCalGas, the Rating Agencies have noted that the following events, among others, could lead to negative ratings actions:

▪SoCalGas’ financial measures consistently weaken, or it fails to meet certain financial credit metrics ▪SoCalGas experiences increased business risk, including a deterioration in the regulatory environment, leading to weakening of its stand-alone business risk profile ▪a ratings downgrade at Sempra For SI Partners, the Rating Agencies have noted that the following events, among others, could lead to negative ratings actions:

▪SI Partners’ failure to meet certain financial credit metrics ▪a deterioration in SI Partners’ business risk profile, including incremental construction risk or adverse changes in the operating environment in Mexico ▪a ratings downgrade at Sempra, IEnova and/or Cameron LNG, LLC A downgrade of any of our businesses’ credit ratings or ratings outlooks, as well as the reasons for such downgrades, may materially adversely affect the market prices of our securities, the interest rates at which borrowings can be made and debt securities issued, and the various fees on our credit facilities. This could make it more costly for the affected businesses to borrow money, issue securities and/or raise other types of capital, any of which could materially adversely affect our ability to meet our debt obligations and contractual commitments, and our results of operations, financial condition, cash flows and/or prospects.

We do not fully hedge our assets or contract positions against changes in commodity prices or interest rates, and for those positions that are hedged, our hedging procedures may not mitigate our risk as expected or prevent us from experiencing losses.

rewrittenCredit & liquidityAdded interest rate hedging exposure and 2022 commodity derivative unrealized losses volatility; removed reference to physical purchase and sales contracts.

We have used and may continue to use forward contracts, futures, financial swaps and/or options, among other mechanisms, to hedge our known or anticipated purchase and sale commitments, inventories of natural gas and LNG, natural gas storage and pipeline capacity and electric generation capacity in an effort to reduce our financial exposure related to commodity price fluctuations. We do not hedge the entire exposure to market price volatility of our assets or our contract positions, and the extent of the coverage to these exposures varies over time. In addition, we have used and may continue to use similar financial instruments to hedge against changes in interest rates. Certain derivative securities we use to hedge are recorded at fair value through earnings to reflect movements in the price of the security, which has in the past and could in the future create volatility in our earnings (such as the significantly higher unrealized losses on commodity derivatives that we recognized in 2022 compared to 2021 as we discuss in “Part II – Item 7.

MD&A – Results of Operations”). To the extent we have unhedged positions, or if our hedging strategies do not work as expected, fluctuating commodity prices could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. Certain of the contracts we may use for hedging purposes are subject to fair value accounting, which may result in gains or losses in earnings for those contracts that may not reflect the associated gains or losses of the underlying position being hedged and could result in fluctuations of our results from period to period.

Compare with the 2022 10-K

Prior heading: We do not fully hedge our assets or contract positions against changes in commodity prices, and for those contract positions that are hedged, our hedging procedures may not mitigate our risk as expected.

We have used and may continue to use forward contracts, physical purchase and sales contracts, futures, financial swaps and/or options, among others, other mechanisms, to hedge our known or anticipated purchase and sale commitments, inventories of natural gas and LNG, natural gas storage and pipeline capacity and electric generation capacity to try in an effort to reduce our financial exposure related to commodity price fluctuations. We do not hedge the entire exposure to market price volatility of our assets or our contract positions, and the extent of the coverage to these exposures varies over time. In addition, we have used and may continue to use similar financial instruments to hedge against changes in interest rates. Certain derivative securities we use to hedge are recorded at fair value through earnings to reflect movements in the price of the security, which has in the past and could in the future create volatility in our earnings (such as the significantly higher unrealized losses on commodity derivatives that we recognized in 2022 compared to 2021 as we discuss in “Part II – Item 7. MD&A – Results of Operations”). To the extent we have unhedged positions, or if our hedging strategies do not work as expected, fluctuating commodity prices could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. Certain of the contracts we may use for hedging purposes are subject to fair value accounting, which may result in gains or losses in earnings for those contracts that may not reflect the associated gains or losses of the underlying position being hedged and could result in fluctuations of our results from period to period.

Added · Removed · word-level comparison of the two filings

Risk management procedures may not prevent or mitigate losses.

unchangedOther

Although we have in place risk management and control systems designed to quantify and manage risk, these systems may not prevent material losses. Risk management procedures may not always be followed as intended or function as expected. In addition, daily VaR and loss limits, which are primarily based on historic price movements and which we discuss in “Part II – Item 7A. Quantitative and Qualitative Disclosures About Market Risk,” may not protect us from losses if prices significantly or persistently deviate from historic prices. As a result of these and other factors, our risk management procedures and systems may not prevent or mitigate losses that could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Market performance or changes in other assumptions could require unplanned contributions to pension and PBOP plans.

unchangedCredit & liquidity

Sempra, SDG&E and SoCalGas provide defined benefit pension and PBOP plans to eligible employees and retirees. The cost of providing these benefits is affected by many factors, including the market value of plan assets and the other factors described in Note 9 of the Notes to Consolidated Financial Statements. A decline in the market value of plan assets or an adverse change in any of these other factors could cause a material increase in our funding obligations for these plans, which could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

Our businesses require numerous permits, licenses, franchises and other approvals from various governmental agencies, and the failure to obtain or maintain any of them, or lengthy delays in obtaining them, could materially adversely affect us.

unchangedRegulatory

Our businesses require numerous permits, licenses, rights-of-way, franchises, certificates and other approvals from federal, state, local and foreign governmental agencies. These approvals may not be granted in a timely manner or at all or may be modified, rescinded or fail to be extended for a variety of reasons. Obtaining or maintaining these approvals could result in higher costs or the imposition of conditions or restrictions on our operations. For example, SoCalGas’ franchise agreement with Los Angeles County is scheduled to expire in June 2023. Further, these approvals require compliance by us and may require compliance by our customers, which could result in modification, suspension or rescission and subject us to fines and penalties in the event of noncompliance.

If one or more of these approvals were to be suspended, rescinded or otherwise terminated, including due to expiration or legal or regulatory changes, or modified in a manner that makes our continued operation of the applicable business prohibitively expensive or otherwise undesirable or impossible, we may be required to adjust or temporarily or permanently cease certain of our operations, sell the associated assets or remove them from service and/or construct new assets intended to bypass the impacted area, in which case we may lose some of our rate base or revenue-generating assets, our development projects may be negatively affected and we may incur impairment charges or other costs that may not be recoverable. The occurrence of any of these events could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

We may invest funds in capital projects prior to receiving all regulatory approvals. If there is a delay in obtaining these approvals; if any approval is conditioned on changes or other requirements that increase costs or impose restrictions on our existing or planned operations; if we fail to obtain or maintain these approvals or comply with them or other applicable laws or regulations; if we are involved in litigation that adversely impacts any approval or rights to the applicable property or assets; or if management decides not to proceed with a project, we may be unable to recover any or all amounts invested in that project. Any such occurrence could cause our costs to materially increase, result in material impairments, and otherwise materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Our businesses face climate change concerns and have environmental compliance and clean energy transition costs, which could have a material adverse effect on us.

rewrittenClimate & physicalExpanded to include clean energy transition costs, SB 100 (2018) and SB 1020 (2022) decarbonization targets (90% by 2035, 95% by 2040), capital/employee resource demands, and affordability impacts; removed prior general climate sentiment language.

Climate change and the costs associated with its impacts and mitigation may have the potential to adversely affect our businesses, including by increasing the costs we incur to transmit energy and provide other services, impacting the demand for and consumption of the natural gas we distribute and the energy we transmit (due to changes in costs, weather patterns, the type of energy transmitted as a result of increasing customer preference for carbon-neutral and renewable sources of energy, and other factors), and affecting the economic health of the regions in which we operate.

Our businesses are subject to extensive federal, state, local and foreign statutes, orders, rules and regulations relating to climate change and environmental protection. To comply with these requirements, we must expend significant capital and employee resources on (i) environmental monitoring, surveillance and other measures to track performance; (ii) acquisitions of pollution control equipment; (iii) mitigation efforts; and (iv) emissions fees, which could increase as a result of various factors we may not control, including changing laws and regulations, increased enforcement activities, delays in the renewal and issuance of permits, and changes to the mix of energy we are required to supply. In addition, we are generally responsible for hazardous substances and other contamination on and the conditions of our projects and properties, regardless of when these conditions arose and whether they are known or unknown.

In addition, we could be liable for contamination at our former facilities and off-site waste disposal sites that have been used in our operations. For our regulated utilities, some of these costs may not be recoverable in rates. Failure to comply with environmental laws and regulations may subject our businesses to fines and penalties, including criminal penalties in some cases, and/or curtailment of our operations. Any of these outcomes could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Increasing international, national, regional, state and local-level environmental concerns and related new or proposed legislation and regulation or changes to existing legislation or regulation, such as increased requirements for monitoring and surveillance, disclosures on environmental performance and targets, pollution monitoring and control equipment, safety practices, emissions fees, taxes, penalties or other obligations or restrictions, may have material negative effects on our operations, operating costs, corporate planning, and the scope and economics of proposed expansions, infrastructure projects or other capital expenditures.

In addition, existing and potential new or amended legislation and regulation relating to the control and reduction of GHG emissions and mitigating climate change may materially restrict our operations, negatively impact demand for our services, the natural gas we distribute and/or the energy we transmit, limit development opportunities, force costly or otherwise burdensome changes to our operations or otherwise materially adversely affect us. For example, SB 100 (enacted in 2018) and SB 1020 (enacted in 2022) requires each California electric utility, including SDG&E, to procure at least 50% of its annual electric energy requirements from renewable energy sources by 2026, 60% by 2030, 90% by 2035, and 95% by 2040.

State law also creates the policy of meeting all of California’s retail electricity supply with a mix of RPS Program-eligible and zero-carbon resources by 2045. The law also includes stipulations that this policy not increase carbon emissions elsewhere in the western grid and not allow resource shuffling, and requires that the CPUC, CEC, CARB and other state agencies incorporate this policy into all relevant planning. In addition, the Governor of California signed an executive order establishing a new statewide goal to achieve carbon neutrality as soon as possible, and no later than 2045, and achieve and maintain net negative emissions thereafter. The executive order calls on CARB to address this goal in future scoping plans, which affect several major sectors of California’s economy, including transportation, agriculture, development, industrial and others. California has issued new climate initiatives in line with this statewide goal, including two executive orders requiring sales of all passenger vehicles to be zero-emission by 2035.

Moreover, the energy transition in California and elsewhere, including decarbonization goals, has introduced uncertainty in investor support over the long term, leading some to reduce investment in or divest from the energy sector. Maintaining investor confidence and attracting capital at a competitive cost will depend in part on successfully demonstrating our ability to reduce emissions associated with our operations and the energy we transmit, consistent with Sempra’s aim to have net-zero emissions by 2050 and SDG&E’s and SoCalGas’ aim to have net-zero emissions by 2045. Our ability to achieve this aim depends on many factors, some of which we do not control, including supportive energy laws and policies, development, availability and adoption of alternative fuels, successful research and development efforts focused on low-carbon technologies that are economically and technically feasible, cooperation from our partners, financing sources and commercial counterparties, customer participation in conservation and energy efficiency programs, and our ability to execute our planned investments in and advancement of our infrastructure.

Although we have developed interim targets and various plans designed to support California in reaching its GHG emissions and renewable energy mandates and our own energy goals, we may not be successful.

We will need to continue to expend capital and employee resources to develop and deploy new technologies and modernize grid systems in our efforts to support the clean energy transition in California and elsewhere and achieve our climate targets and those mandated by applicable authorities, which may not be recoverable in rates or, with respect to our non-regulated utility businesses, may not be able to be passed through to customers. Even if such costs are recoverable, the costs of these efforts and complying with these mandates, coupled with the necessary costs of investing for safety and reliability, may negatively impact the affordability of SDG&E’s and SoCalGas’ customer rates and, for our non-regulated utility businesses, may cause costs to increase to levels that reduce customer demand and growth.

SDG&E and SoCalGas, as well as any of our other businesses affected by GHG emissions mandates, may also be subject to fines and penalties if mandated renewable energy goals are not met, and all our businesses could suffer difficulties attracting investors and business partners, reputational harm and other negative effects if we do not meet or if we scale back our GHG emissions goals or there are negative views about our environmental disclosures or practices generally. Any of these outcomes could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

Compare with the 2022 10-K

Prior heading: Our businesses are facing climate change concerns and have environmental compliance costs, which could have a material adverse effect on us.

Climate change and the costs that may be associated with its impacts and mitigation may have the potential to adversely affect our businesses in many ways, businesses, including by increasing the costs we incur in providing our services and the to transmit energy we transmit, and provide other services, impacting the demand for and consumption of our services the natural gas we distribute and the energy we transmit (due to changes in both costs and costs, weather patterns), patterns, the type of energy transmitted as a result of increasing customer preference for carbon-neutral and renewable sources of energy, and other factors), and affecting the economic health of the regions in which we operate. Energy customers are also increasingly indicating preferences for carbon-neutral and renewable sources of energy. operate. Our businesses are subject to extensive federal, state, local and foreign statutes, orders, rules and regulations relating to environmental protection and climate change. change and environmental protection. To comply with these legal requirements, we must spend expend significant amounts capital and employee resources on (i) environmental monitoring monitoring, surveillance and surveillance, other measures to track performance; (ii) acquisitions of pollution control equipment, equipment; (iii) mitigation costs efforts; and (iv) emissions fees, and these amounts which could increase as a result of various factors we may not control, including if requirements change, changing laws and regulations, increased enforcement activities, delays in the renewal and issuance of requirements increases, permits are not issued, renewed or amended as anticipated, energy demands increase or our permits, and changes to the mix of energy supplies changes. we are required to supply. In addition, we may be are generally responsible for on-site liabilities associated with the environmental hazardous substances and site condition other contamination on and the conditions of our projects and properties, regardless of when the liabilities these conditions arose and whether they are known or unknown, which exposes us to risks arising from unknown. In addition, we could be liable for contamination at our existing and former facilities and off-site waste disposal sites that have been used in our operations. For our regulated utilities, some of these costs may not be recoverable in rates. Failure to comply with environmental laws and regulations may subject our businesses to fines and penalties, including criminal penalties in some cases, and/or curtailments curtailment of our operations. Any of these outcomes could materially adversely affect our results of operations, financial condition, cash flows and/or prospects. Increasing international, national, regional regional, state and state-level local-level environmental concerns and related new or proposed legislation and regulation or changes to existing legislation or regulation, such as increased requirements for monitoring and surveillance, disclosures on environmental performance and targets, pollution monitoring and control equipment, safety practices, emission emissions fees, taxes, penalties or other obligations or restrictions, may have material negative effects on our operations, operating costs, corporate planning planning, and the scope and economics of proposed expansions, infrastructure projects or other capital expenditures. expenditures. In particular, addition, existing and potential new or amended legislation and regulation relating to the control and reduction of GHG emissions and mitigating climate change may materially restrict our operations, negatively impact demand for our services services, the natural gas we distribute and/or the energy we transmit, limit development opportunities, force costly or otherwise burdensome changes to our operations or otherwise materially adversely affect us. For example, SB 100 (enacted in 2018) and SB 1020 (enacted in 2022) requires each California electric utility, including SDG&E, to procure at least 50% of its annual electric energy requirements from renewable energy sources by 2026, and 60% by 2030. SB 100 2030, 90% by 2035, and 95% by 2040. State law also creates the policy of meeting all of California’s retail electricity supply with a mix of RPS Program-eligible and zero-carbon resources by 2045. The law also includes stipulations that this policy not increase carbon emissions elsewhere in the western grid and not allow resource shuffling, and requires that the CPUC, CEC, CARB and other state agencies incorporate this policy into all relevant planning. In addition to signing SB 100 into law, addition, the then-Governor Governor of California also signed an executive order establishing a new statewide goal to achieve carbon neutrality as soon as possible, and no later than 2045, and achieve and maintain net negative emissions thereafter. The executive order calls on CARB to address this goal in future scoping plans, which affect several major sectors of California’s economy, including transportation, agriculture, development, industrial and others. California has issued new climate initiatives in line with this statewide goal, including two executive orders requiring sales of all passenger vehicles to be zero-emission by 2035. Moreover, shifts the energy transition in California and elsewhere, including decarbonization goals, has introduced uncertainty in investor sentiment regarding fossil fuels is support over the long term, leading some to reduce investment in or divest from the sector completely. energy sector. Maintaining investor confidence and attracting capital at a competitive cost will be dependent depend in part on successfully demonstrating our ability to reduce emissions associated with our operations and the energy we transmit, consistent with our Sempra’s aim to have net-zero emissions by 2050. Our ability 2050 and SDG&E’s and SoCalGas’ aim to reach have net-zero emissions by 2050 2045. Our ability to achieve this aim depends on many factors, some of which we do not control, including supportive energy laws and policies, development and development, availability and adoption of alternative fuels, successful research and development efforts focused on low-carbon technologies that are economically and technically feasible, cooperation from our partners, financing sources and commercial counterparties, and customer participation in conservation and energy efficiency programs. programs, and our ability to execute our planned investments in and advancement of our infrastructure. Although we have developed interim targets and various plans designed to support California in reaching its GHG emissions mandates, including SB 100, and renewable energy mandates and our own energy goals, we may not be successful. We will need to continue to make expend capital expenditures and incur costs employee resources to develop and deploy new technologies and modernize grid systems in our efforts to support the clean energy transition in California and elsewhere and achieve our climate targets and those mandated by applicable authorities, which may not be recoverable in rates or, with respect to our non-regulated utility businesses, may not be able to be passed through to customers. Even if such costs are recoverable, the resulting costs of these efforts and complying with these mandates, coupled with the necessary costs of investing for safety and reliability, may negatively impact the affordability of SDG&E’s and SoCalGas’ customer rates or other and, for our non-regulated utility businesses, may cause costs to customers may increase to levels that reduce customer demand and growth. SDG&E and SoCalGas, as well as any of our other businesses affected by GHG emissions mandates, may also be subject to fines and penalties if mandated renewable energy goals are not met, and all of our businesses could suffer difficulties attracting investors and business partners, reputational harm and other negative effects if we do not meet or if we scale back our GHG emissions goals or there are negative views about our environmental disclosures or practices generally. Any of these outcomes could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

Added · Removed · word-level comparison of the two filings

Our businesses are subject to numerous governmental regulations and complex tax and accounting requirements and may be materially adversely affected by them or any changes to them.

unchangedRegulatory

The electric power and natural gas industries are subject to numerous governmental regulations, and our businesses are also subject to complex tax and accounting requirements. These regulations and requirements may undergo changes at the federal, state, local and foreign levels, including in response to economic or political conditions. Compliance with these regulations and requirements, including in the event of changes to them or how they are implemented, interpreted or enforced, could increase our operating costs and materially adversely affect how we conduct our business. New tax legislation, regulations or interpretations or changes in tax policies in the U.S. or other countries in which we operate or do business could negatively affect our tax expense and/or tax balances and our businesses generally.

Any failure to comply with these regulations and requirements could subject us to fines and penalties, including criminal penalties in some cases, and result in the temporary or permanent shutdown of certain facilities or operations. The occurrence of any of these risks could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

Our operations are subject to rules relating to transactions among SDG&E, SoCalGas and other Sempra businesses. These rules are commonly referred to as “affiliate rules,” and they primarily impact transmission supply, capacity and marketing activities, including restricting our ability to sell natural gas or electricity to, or trade with, SDG&E and SoCalGas and their ability to complete these transactions with each other. These rules, as well as any changes to these rules or their interpretations or additional more restrictive CPUC or FERC rules related to transactions with affiliates, could materially adversely affect our operations and, in turn, our results of operations, financial condition, cash flows and/or prospects.

We may be materially adversely affected by the outcome of litigation or other proceedings in which we are involved.

unchangedLitigation

Our businesses are involved in a number of lawsuits, binding arbitrations, regulatory investigations and other proceedings. We discuss material pending proceedings in Note 16 of the Notes to Consolidated Financial Statements. We have spent, and continue to spend, substantial money, time and employee and management focus on these lawsuits and other proceedings. The uncertainties inherent in lawsuits and other proceedings make it difficult to estimate with any degree of certainty the timing, costs and ranges of costs or effects of resolving these matters. In addition, juries have demonstrated a willingness to grant large awards, including punitive damages, in response to personal injury, product liability, property damage and other claims.

Accordingly, actual costs incurred have and may continue to differ materially from insured or reserved amounts and may not be recoverable, in whole or in part, from insurance or in customer rates. Any of the foregoing could cause reputational damage and materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

RISKS RELATED TO SEMPRA CALIFORNIA

Wildfires in California pose risks to Sempra California (particularly SDG&E) and Sempra.

unchangedClimate & physical

Potential for Increased and More Severe Wildfires Over the past few years, California has been experiencing some of the largest wildfires (measured by acres burned) in its history. Frequent and severe drought conditions, inconsistent and extreme swings in precipitation, changes in vegetation, unseasonably warm temperatures, low humidity, strong winds and other factors have increased the duration of the wildfire season and the intensity, prevalence and difficulty of prevention and containment of wildfires in California, including in SDG&E’s and SoCalGas’ service territories. Changing weather patterns, including as a result of climate change, could cause these conditions to become even more extreme and unpredictable. These wildfires could jeopardize SDG&E’s and SoCalGas’ electric and natural gas infrastructure and third-party property and result in temporary power shortages in SDG&E’s and SoCalGas’ service territories.

Certain of California’s local land use policies and forestry management practices have been relaxed to allow for the construction and development of residential and commercial projects in high-risk fire areas, which could lead to increased third-party claims and greater losses in the event of fires in these areas for which SDG&E or SoCalGas may be liable. Any such wildfires in SDG&E’s and SoCalGas’ territories (or outside of these territories in the event the Wildfire Fund described below is materially diminished) could materially adversely affect SDG&E’s, SoCalGas’ and Sempra’s results of operations, financial condition, cash flows and/or prospects, which we discuss in this risk factor below and above under “Risks Related to All Sempra Businesses – Operational Risks.”

The Wildfire Legislation In July 2019, the Wildfire Legislation was signed into law, which we discuss in Note 1 of the Notes to Consolidated Financial Statements. The Wildfire Legislation’s revised legal standard for the recovery of wildfire costs may not be implemented effectively or applied consistently, we may not be eligible for the Wildfire Legislation’s cap on wildfire-related liability if SDG&E fails to maintain a valid annual safety certification from the OEIS or meet other requirements of the legislation, and/or the Wildfire Fund could be exhausted due to claims against the fund by SDG&E or other participating IOUs as a result of fires in their respective service territories, any of which could have a material adverse effect on Sempra’s and SDG&E’s results of operations, financial condition, cash flows and/or prospects.

PG&E has indicated that it will seek reimbursement from the Wildfire Fund for losses associated with the Dixie fire, which burned from July 2021 through October 2021 and was reported to be the largest single wildfire (measured by acres burned) in California history. In addition, the Wildfire Legislation did not change the doctrine of inverse condemnation, which imposes strict liability (meaning that liability is imposed regardless of fault) on a utility whose equipment, such as its electric distribution and transmission lines, is determined to be a cause of a fire. In such an event, the utility would be responsible for the costs of damages, including potential business interruption losses, and interest and attorneys’ fees, even if the utility has not been found negligent.

The doctrine of inverse condemnation also is not exclusive of other theories of liability, including if the utility were found negligent, in which case additional liabilities, such as fire suppression, clean-up and evacuation costs, medical expenses, and personal injury, punitive and other damages, could be imposed. We are unable to predict the impact of the Wildfire Legislation on SDG&E’s ability to recover costs and expenses in the event that SDG&E’s equipment is determined to be a cause of a fire, and specifically in the context of the application of inverse condemnation.

Cost Recovery Through Insurance or Rates As a result of the strict liability standard applied to electric IOU-caused wildfires in California, substantial losses recently recorded by insurance companies, and the risk of an increase in the number and size of wildfires, obtaining insurance coverage for wildfires that could be caused by SDG&E (or, to a lesser extent, SoCalGas) has become increasingly difficult and costly. If these conditions continue or worsen, insurance for wildfire liabilities may become unavailable or may become prohibitively expensive and we may be challenged or unsuccessful when we seek recovery of insurance cost increases through the regulatory process. In addition, insurance for wildfire liabilities may not be sufficient to cover all losses we may incur, or it may not be available in sufficient amounts to meet the $1.0 billion of primary insurance required by the Wildfire Legislation.

We are unable to predict whether we would be able to recover in rates or from the Wildfire Fund the amount of any uninsured losses. A loss that is not fully insured, is not sufficiently covered by the Wildfire Fund and/or cannot be recovered in customer rates could materially adversely affect Sempra’s and one or both of SDG&E’s and SoCalGas’ results of operations, financial condition, cash flows and/or prospects.

Wildfire Mitigation Efforts Although we expend significant resources on measures designed to mitigate wildfire risks, these measures may not be effective in preventing wildfires or reducing our wildfire-related losses and their costs may not be fully recoverable in rates. SDG&E is required by applicable California law to submit annual wildfire mitigation plans for approval by the OEIS and could be subject to increased risks if these plans are not approved in a timely manner or the measures set forth in the plans are not implemented effectively, as well as fines or penalties for any failure to comply with the approved plans. One of our wildfire mitigation and safety tools is to de-energize certain of our facilities when weather conditions become extreme and there is elevated wildfire ignition risk.

These “public safety power shutoffs” have been subject to scrutiny by various stakeholders, including customers, regulators and lawmakers, which could increase the risk of liability for damages associated with these events. Such costs may not be recoverable in rates. Unrecoverable costs, adverse legislation or rulemaking, scrutiny by key stakeholders, ineffective wildfire mitigation measures or other negative effects associated with these efforts could materially adversely affect Sempra’s and SDG&E’s results of operations, financial condition, cash flows and/or prospects.

The electricity industry is undergoing significant change, including increased deployment of DER, technological advancements, and political and regulatory developments.

rewrittenAI & technologyShortened 'distributed energy resources' to 'DER'; added data management systems, demand management evaluation, CCA jurisdictions, and Power Charge Indifference Adjustment framework details; removed prior procurement forecasts and cost-shifting discussion.

Electric utilities in California are experiencing increasing deployment of DER, such as solar generation, energy storage and energy efficiency and demand management technologies, and California’s environmental policy objectives are accelerating the pace and scope of these changes. This growth of DER and demand management will require further modernization of the electric distribution grid to, among other things, accommodate increasing two-way flows of electricity and increase the grid’s capacity to interconnect these resources. In addition, enabling California’s clean energy goals will require sustained investments in grid modernization, renewable integration projects, energy efficiency programs, energy storage options, operational and data management systems, and electric vehicle infrastructure. The growth of third-party energy storage alternatives and other technologies also may increasingly compete with SDG&E’s traditional transmission and distribution infrastructure in delivering electricity to consumers.

The CPUC is conducting several proceedings regarding DER and demand management, including the evaluation of various projects and pilots; changes to the planning and operation of the electric distribution grid to prepare for higher penetration of DER; future grid modernization and grid investments; the deferral of traditional grid investments by DER; and the role of the electric distribution grid operator. These proceedings and the broader changes in California’s electricity industry could result in new regulations, policies and/or operational changes that could materially adversely affect SDG&E’s and Sempra’s results of operations, financial condition, cash flows and/or prospects.

SDG&E provides bundled electric procurement service through various resources that are typically procured on a long-term basis. Although SDG&E currently provides such procurement service for a portion of its customer load, most customers receive procurement service from a load-serving entity other than SDG&E through programs such as CCA and DA, in which case SDG&E no longer procures energy for this departing load. CCA is only available if a customer’s local jurisdiction (city or county) offers such a program and DA is currently limited by a cap based on gigawatt hours. Several jurisdictions in SDG&E’s territory, including the City of San Diego, have implemented CCA, and additional jurisdictions are in the process of implementing or considering CCA.

SDG&E’s historical energy procurement for future deliveries exceeds the needs of its remaining bundled customers as customers have elected CCA and DA services. To help achieve the goal of ratepayer indifference (as to whether or not customers’ energy is procured by SDG&E or by CCA or DA), the CPUC revised the Power Charge Indifference Adjustment framework. The purpose of the framework is to help ensure SDG&E’s procurement cost obligations are more equitably shared among customers served by SDG&E and customers now served by CCA and DA. SDG&E implemented the framework on January 1, 2019. If the framework or other mechanisms designed to achieve ratepayer indifference do not perform as intended, if the law changes, or if the law is not interpreted or enforced as expected, SDG&E’s remaining bundled customers could experience large increases in rates for commodity costs under commitments made on behalf of CCA and DA customers prior to their departure or, if all such costs are not recoverable in rates, SDG&E could experience material increases in its unrecoverable commodity costs. Any of these outcomes could have a material adverse effect on SDG&E’s and Sempra’s results of operations, financial condition, cash flows and/or prospects.

Compare with the 2022 10-K

Prior heading: The electricity industry is undergoing significant change, including increased deployment of distributed energy resources, technological advancements, and political and regulatory developments.

Electric utilities in California are experiencing increasing deployment of distributed energy resources (DERs), DER, such as solar generation, energy storage, storage and energy efficiency and demand response management technologies, and California’s environmental policy objectives are accelerating the pace and scope of these changes. This growth of DERs DER and demand management will require further modernization of the electric distribution grid to, among other things, accommodate increasing two-way flows of electricity and increase the grid’s capacity to interconnect these resources. In addition, enabling California’s clean energy goals will require sustained investments in grid modernization, renewable integration projects, energy efficiency programs, energy storage options options, operational and data management systems, and electric vehicle infrastructure. The growth of the third-party energy storage alternatives and other technologies also may increasingly compete with SDG&E’s traditional transmission and distribution infrastructure in delivering electricity to consumers. The CPUC is conducting several proceedings to evaluate regarding DER and demand management, including the evaluation of various projects and pilots; implement changes to the planning and operation of the electric distribution grid to prepare for higher penetration of DERs; consider DER; future grid modernization and grid investments; evaluate if the deferral of traditional grid investments can be deferred by DERs; determine what, if any, compensation would be feasible and appropriate; DER; and clarify the role of the electric distribution grid operator. These proceedings and the broader changes in California’s electricity industry could result in new regulations, policies and/or operational changes that could materially adversely affect SDG&E’s and Sempra’s results of operations, financial condition, cash flows and/or prospects. SDG&E provides bundled electric procurement service through various resources that are typically procured on a long-term basis. While Although SDG&E currently provides such procurement service for most a portion of its customer load, some most customers can receive procurement service from a load-serving entity other than SDG&E through programs such as CCA and DA. In such cases, DA, in which case SDG&E no longer procures energy for this departing load. CCA is only available if a customer’s local jurisdiction (city) (city or county) offers such a program and DA is currently limited by a cap based on gigawatt hours. A number of Several jurisdictions in SDG&E’s territory, including the City and County of San Diego and 14 other municipalities, Diego, have implemented, implemented CCA, and additional jurisdictions are in the process of implementing or are considering implementing CCA. Based on our current expectations, SDG&E could procure energy for less than half of its current customer load by December 31, 2022. SDG&E’s historical energy procurement may exceed for future deliveries exceeds the needs of its remaining bundled customers as customers elect have elected CCA and DA service. Accordingly, services. To help achieve the associated costs goal of the utility’s ratepayer indifference (as to whether or not customers’ energy is procured resources could then be borne by SDG&E’s remaining bundled procurement customers. Existing state law requires that customers having SDG&E or by CCA and DA procure their electricity must absorb or DA), the cost CPUC revised the Power Charge Indifference Adjustment framework. The purpose of above-market electricity the framework is to help ensure SDG&E’s procurement commitments already made by SDG&E on their behalf, which requirements cost obligations are designed to more equitably share costs shared among customers served by SDG&E and customers now served by CCA and DA. SDG&E implemented the framework on January 1, 2019. If adequate the framework or other mechanisms are not implemented designed to help ensure compliance with this law, achieve ratepayer indifference do not perform as intended, if the law changes, or if the law does is not function interpreted or enforced as intended to achieve ratepayer indifference, expected, SDG&E’s remaining bundled customers of SDG&E could experience large increases in rates for commodity costs under commitments made on behalf of CCA and DA customers prior to their departure or, if all such costs are not recoverable in rates, SDG&E could experience material increases in its unrecoverable commodity costs. Any of these outcomes could have a material adverse effect on SDG&E’s and Sempra’s results of operations, financial condition, cash flows and/or prospects.

Added · Removed · word-level comparison of the two filings

Natural gas and natural gas storage have increasingly been the subject of political and public scrutiny, including a desire by some to reduce or eliminate reliance on natural gas as an energy source.

rewrittenRegulatoryExpanded natural gas scrutiny risk to specify California decarbonization measures: Title 24 electric-ready building mandates, CPUC gas infrastructure decommissioning framework (GO 177), elimination of gas line extension allowances after July 1, 2023.

Certain California legislators, as well as stakeholder, advocacy and activist groups, have expressed a desire to limit or eliminate reliance on natural gas as an energy source by advocating increased use of renewable electricity and electrification in lieu of the use of natural gas. Reducing methane emissions also has become a major focus of certain local and state agencies and the U.S. Administration, as well as the CPUC, resulting in passed or proposed legislation, regulation, policies and ordinances to prohibit or restrict the use and consumption of natural gas in new buildings, appliances and other applications. These actions could have the effect of reducing natural gas use over time.

CARB, California’s primary regulator for GHG emissions reduction programs, continues to pursue plans for reducing GHG emissions in line with California’s climate goals that include proposals to reduce natural gas demand through proposed building decarbonization measures (for example, zero-emission standards for space and water heaters), or through promoting legislation for increased renewable electricity generation. Additionally, the CEC’s Title 24 requirements mandate that new construction include electric-ready buildings and heat pump technologies beginning in 2023.

The CPUC has an ongoing proceeding that seeks to establish a state-wide process to help utilities plan appropriate gas infrastructure portfolios as natural gas usage in the state is expected to decline. This includes a new gas infrastructure General Order (GO 177) requiring site-specific approvals for certain gas infrastructure projects as well as issuance of a CPUC staff proposal to develop a gas distribution infrastructure decommissioning framework. The CPUC may similarly enact measures to reduce natural gas demand (such as more aggressive energy efficiency programs), promote fuel substitution (such as replacement of natural gas appliances with electric appliances), and order changes (such as its recent decision to eliminate gas line extension allowances for new applications submitted on or after July 1, 2023).

A substantial reduction in or the elimination of natural gas as an energy source in California without adequate and appropriate recovery of investments could result in impairment of some or all of SoCalGas’ and SDG&E’s natural gas infrastructure assets if they were not permitted to be repurposed for alternative fuels, were required to be depreciated on an accelerated basis or were to become stranded, which could have a material adverse effect on SoCalGas’, SDG&E’s and Sempra’s results of operations, financial conditions, cash flows and/or prospects.

Compare with the 2022 10-K

Prior heading: Natural gas and natural gas storage have increasingly been the subject of political and public scrutiny, including a desire by some to reduce or eliminate reliance on natural gas as an energy source.

Certain California legislators and legislators, as well as stakeholder, advocacy and activist groups groups, have expressed a desire to limit or eliminate reliance on natural gas as an energy source by advocating increased use of renewable electricity and electrification in lieu of the use of natural gas. Reducing methane emissions also has become a major focus of certain U.S. legislators local and the current U.S. Administration. Certain California state agencies and city governments have the U.S. Administration, as well as the CPUC, resulting in passed or proposed legislation, regulation, policies or passed and ordinances to prohibit or restrict the use and consumption of natural gas in new buildings, appliances and other applications. These policies and ordinances and any other similar regulatory action actions could have the effect of reducing natural gas use over time. The CPUC has initiated an OIR to, among other things, implement a long-term planning strategy to manage the state’s transition away from natural gas-fueled technologies in an effort to meet California’s decarbonization goals. time. CARB, California’s primary regulator for GHG emissions reduction programs, continues to pursue plans for reducing GHG emissions in line with California’s climate goals that include proposals to reduce natural gas demand, including demand through proposed building decarbonization measures (for example, zero-emission standards for space and water heaters), or through promoting legislation for increased renewable electricity generation. Additionally, the CEC’s Title 24 requirements mandate that new construction include electric-ready buildings and heat pump technologies beginning in 2023. The CPUC has an ongoing proceeding that seeks to establish a state-wide process to help utilities plan appropriate gas infrastructure portfolios as natural gas usage in the state is expected to decline. This includes a new gas infrastructure General Order (GO 177) requiring site-specific approvals for certain gas infrastructure projects as well as issuance of a CPUC staff proposal to develop a gas distribution infrastructure decommissioning framework. The CPUC may similarly enact measures to reduce natural gas demand (such as more aggressive energy efficiency programs, increased renewable electric generation and programs), promote fuel substitution (such as replacement of natural gas appliances with electric appliances. appliances), and order changes (such as its recent decision to eliminate gas line extension allowances for new applications submitted on or after July 1, 2023). A substantial reduction in, in or the elimination of, of natural gas as an energy source in California could have a material adverse effect on SoCalGas’, SDG&E’s without adequate and Sempra’s results appropriate recovery of operations, financial condition, cash flows and/or prospects, including investments could result in impairment of some or all of SoCalGas’ and SDG&E’s natural gas infrastructure assets if they were not permitted to be repurposed for alternative fuels, were required to be depreciated on an accelerated basis or were to become stranded, without adequate recovery of and which could have a material adverse effect on the investments.SoCalGas’, SDG&E’s and Sempra’s results of operations, financial conditions, cash flows and/or prospects.

Added · Removed · word-level comparison of the two filings

SDG&E may incur significant costs and liabilities from its partial ownership of a nuclear facility being decommissioned.

unchangedLitigation

SDG&E has a 20% ownership interest in SONGS, which we discuss in Note 15 of the Notes to Consolidated Financial Statements. SDG&E and each of the other owners of SONGS is responsible for financing its share of the facility’s expenses and capital expenditures, including those related to decommissioning activities. Although the facility is being decommissioned, SDG&E’s ownership interest in SONGS continues to subject it to risks, including:

▪the potential release of radioactive material ▪the potential harmful effects from the former operation of the facility ▪limitations on the insurance commercially available to cover losses associated with operating and decommissioning the facility ▪uncertainties with respect to the technological and financial aspects of decommissioning the facility SDG&E maintains the SONGS NDT to provide funds for nuclear decommissioning. Trust assets have been generally invested in equity and debt securities, which are subject to market fluctuations. A decline in the market value of trust assets, an adverse change in the law regarding funding requirements for decommissioning trusts, or changes in assumptions or forecasts related to decommissioning dates, technology and the cost of labor, materials and equipment due to inflationary pressures or otherwise could increase the funding requirements for these trusts, which costs may not be fully recoverable in rates.

In addition, CPUC approval is required to make withdrawals from the NDT, and CPUC approval for certain expenditures may be denied if the CPUC determines the expenditures are unreasonable. In addition, decommissioning may be materially more expensive than we currently anticipate and therefore decommissioning costs may exceed the amounts in the NDT. Rate recovery for overruns would require CPUC approval, which may not occur.

The occurrence of any of these events could result in a reduction in our expected recovery and have a material adverse effect on SDG&E’s and Sempra’s results of operations, financial condition, cash flows and/or prospects.

SDG&E and SoCalGas are subject to extensive regulation by federal, state and local legislative and regulatory authorities, which may materially adversely affect Sempra, SDG&E and SoCalGas.

rewrittenRegulatoryExpanded to detail CPUC oversight of wildfire mitigation, pipeline safety, clean energy transition costs, capital structure, and cost of capital mechanisms; removed specific CCM trigger examples and COVID-19 extraordinary event discussion.

Rates and Other Financial Matters The CPUC regulates SDG&E’s and SoCalGas’ customer rates, except for SDG&E’s electric transmission rates that are regulated by the FERC, and conditions of service. The CPUC also regulates SDG&E’s and SoCalGas’ sales of securities, rates of return, capital structure, rates of depreciation, long-term resource procurement and other financial matters in various ratemaking proceedings. The CPUC periodically approves SDG&E’s and SoCalGas’ customer rates based on authorized capital expenditures, operating costs, including income taxes, and an authorized rate of return on investments while incorporating a risk-based decision-making framework, as well as settlements with third parties. The outcome of ratemaking proceedings can be affected by various factors, many of which are not in our control, including the level of opposition by intervening parties; any rejection by the CPUC of settlements with third parties; potential rate impacts; increasing levels of regulatory review; changes in the political, regulatory, or legislative environments; and the opinions of regulators, consumer and other stakeholder groups and customers.

These ratemaking proceedings include decisions about major programs in which SDG&E and SoCalGas make investments under an approved CPUC framework, such as wildfire mitigation and pipeline and storage integrity and safety enhancement programs, but which investments may remain subject to a CPUC filing or reasonableness review with potentially unclear standards or other factors as described above that may result in the disallowance of incurred costs. SDG&E and SoCalGas also may be required to incur costs and make investments to comply with proposed legislative and regulatory requirements and initiatives, including those related to California’s climate goals and policies, and their ability to recover these costs and investments may depend on the final form of the legislative or regulatory requirements and the ratemaking mechanisms associated with them.

Recovery can also be affected by the timing and process of the ratemaking mechanism, in which there can be a significant time lag between when costs are incurred and when those costs are recovered in customers’ rates and material differences between the forecasted and authorized costs embedded in rates (which are set on a prospective basis) and the actual costs incurred. The CPUC may also experience delays in its decisions on recovery or may deny recovery altogether on the basis that costs were not reasonably or prudently incurred or for other reasons. Even if recoverable, the cost of investments to support the clean energy transition in California while also investing in necessary safety and reliability may negatively impact the affordability of SDG&E’s and SoCalGas’ customer rates and their and Sempra’s results of operations, financial condition, cash flows and/or prospects.

In addition, a CPUC cost of capital proceeding every three years determines a utility’s authorized capital structure and authorized return on rate base, and the CCM applies in the interim years and considers changes in the cost of capital based on changes in interest rates for each 12-month period ending September 30 (the measurement period). Alternatively, each of SDG&E and SoCalGas are permitted to file a cost of capital application in an interim year in which an extraordinary or catastrophic event materially impacts its cost of capital and affects utilities differently than the market as a whole to have its cost of capital determined in lieu of the CCM.

Any such rate change due to a downward trigger of the CCM could have a material adverse effect on Sempra’s and the applicable utility’s results of operations, financial condition, cash flows and/or prospects. We discuss the CCM in “Part I – Item 1. Business - Ratemaking Mechanisms – Sempra California – Cost of Capital Proceedings,” and in Note 4 of the Notes to Consolidated Financial Statements.

The FERC regulates electric transmission rates, the transmission and wholesale sales of electricity in interstate commerce, transmission access, the rates of return on investments in electric transmission assets, and other similar matters involving SDG&E. These ratemaking mechanisms are subject to many risks similar to those described above regarding the CPUC ratemaking proceedings.

CPUC Authority Over Operational Matters The CPUC has regulatory authority related to safety standards and practices, competitive conditions, reliability and planning, affiliate relationships and a wide range of other operational matters, including citation programs concerning matters such as safety activity, disconnection and billing practices, resource adequacy and environmental compliance. Many of these standards and citation programs are becoming more stringent and could impose significant penalties, including enforcement programs under which the CPUC staff can issue citations that in some cases can impose substantial fines. The CPUC also continues to explore expansion of its programs to provide additional oversight. The CPUC conducts reviews and audits of the matters under its authority and could launch investigations or open proceedings at any time on any such matter it deems appropriate, the results of which could lead to citations, disallowances, fines and penalties, as well as corrective or mitigation actions required to address any noncompliance that may not be sufficiently funded by customer rates or at all. Any such occurrence could have a material adverse effect on Sempra’s, SDG&E’s and SoCalGas’ results of operations, financial condition, cash flows and/or prospects.

We discuss various CPUC proceedings relating to SDG&E and SoCalGas in Notes 4 and 16 of the Notes to Consolidated Financial Statements.

Potential Regulatory Changes and Influence of Other Organizations SDG&E, SoCalGas and Sempra may be materially adversely affected by revisions or reinterpretations of existing or new legislation, regulations, decisions, orders or interpretations of the CPUC, the FERC or other regulatory bodies, any of which could change how SDG&E and SoCalGas operate, affect their ability to recover various costs through rates or adjustment mechanisms, require them to incur additional expenses or otherwise materially adversely affect their and Sempra’s results of operations, financial condition, cash flows and/or prospects.

SDG&E and SoCalGas are also affected by numerous advocacy groups, including California Public Advocates Office, The Utility Reform Network, Utility Consumers’ Action Network and the Sierra Club. Any success by any of these groups in directly or indirectly influencing regulatory bodies with authority over their operations could have a material adverse effect on SDG&E’s, SoCalGas’ and Sempra’s results of operations, financial condition, cash flows and/or prospects.

Compare with the 2022 10-K

Prior heading: SDG&E and SoCalGas are subject to extensive regulation by federal, state and local legislative and regulatory authorities, which may materially adversely affect Sempra, SDG&E and SoCalGas.

Rates and Other Financial Matters The CPUC regulates SDG&E’s and SoCalGas’ customer rates, except for SDG&E’s electric transmission rates that are regulated by the FERC, and conditions of service, as well as its service. The CPUC also regulates SDG&E’s and SoCalGas’ sales of securities, rates of return, capital structure, rates of depreciation, long-term resource procurement and other financial matters in various ratemaking proceedings. The CPUC also periodically approves SDG&E’s and SoCalGas’ customer rates based on authorized capital expenditures, operating costs, including income taxes, and an authorized rate of return on investments while incorporating a risk-based decision-making framework, as well as settlements with third parties. The outcome of ratemaking proceedings can be affected by various factors, many of which are not in our control, including the level of opposition by intervening parties; any rejection by the CPUC of settlements with third parties; potential rate impacts; increasing levels of regulatory review; changes in the political, regulatory, or legislative environments; and the opinions of regulators, consumer and other stakeholder groups and customers. These ratemaking proceedings include decisions about major programs in which SDG&E and SoCalGas make investments under an approved CPUC framework, such as wildfire mitigation and pipeline and storage integrity and safety enhancement programs, but which investments may remain subject to a CPUC filing or reasonableness review with potentially unclear standards or other factors as described above that may result in the disallowance of incurred costs. SDG&E and SoCalGas also may be required to incur costs and make investments to comply with proposed legislative and regulatory requirements and initiatives, including those related to California’s climate goals and policies, and its their ability to recover these costs and investments may depend on the final form of the legislative or regulatory requirements and the ratemaking mechanisms associated with them. Recovery can also be affected by the timing and process of the ratemaking mechanism mechanism, in which there can be a significant time lag between when costs are incurred and when those costs are recovered in customers’ rates and material differences between the forecasted and authorized costs embedded in rates (which are set on a prospective basis) and the actual costs incurred. The CPUC may also experience delays in its decisions on recovery or may deny recovery altogether on the basis that costs were not reasonably or prudently incurred or for other reasons. Any Even if recoverable, the cost of these outcomes could materially adversely affect investments to support the clean energy transition in California while also investing in necessary safety and reliability may negatively impact the affordability of SDG&E’s and SoCalGas’ customer rates and its their and Sempra’s results of operations, financial condition, cash flows and/or prospects. In addition, under the CPUC’s cost of capital framework, SDG&E and SoCalGas are required to file new a CPUC cost of capital applications proceeding every three years. SDG&E’s and SoCalGas’ cost of years determines a utility’s authorized capital are then assessed structure and authorized return on rate base, and the CCM applies in the intervening interim years through and considers changes in the CCM. The CCM, if triggered by cost of capital based on changes in key benchmark interest rates, automatically updates SDG&E’s or SoCalGas’, as applicable, authorized rates of return for that year. For the 12-months ended each 12-month period ending September 30, 2021, SoCalGas did not trigger the CCM, while SDG&E exceeded its benchmark rate, which would trigger the CCM. The CPUC alternatively provides that 30 (the measurement period). Alternatively, each of SDG&E and SoCalGas each has the right are permitted to have its file a cost of capital assessed through an application based on in an interim year in which an extraordinary or catastrophic event that materially impacts its cost of capital and affect affects utilities differently than the market as a whole. If the CPUC finds that the conditions are met to file such an application, the CCM would not apply. SDG&E has filed an application whole to have its cost of capital for 2022 assessed through a cost of capital proceeding based on the extraordinary events determined in lieu of the COVID-19 pandemic, rather than have the CCM applied. The CPUC has established a proceeding CCM. Any such rate change due to determine if SDG&E’s cost a downward trigger of capital was impacted by an extraordinary event. If the CPUC finds that there was not an extraordinary event, the CCM trigger for SDG&E could materially adversely affect have a material adverse effect on Sempra’s and the applicable utility’s results of operations, financial condition, cash flows and/or prospects of Sempra and SDG&E. If the CPUC finds that there was an extraordinary event, it will then determine whether to suspend the CCM for 2022 and preserve SDG&E’s current authorized cost of capital or hold a second phase of the proceeding to set a new cost of capital for 2022. prospects. We further discuss the CCM, including the impact of SDG&E’s trigger of the CCM in the most recent measurement period, in “Part I – Item 1. Business – - Ratemaking Mechanisms – Sempra California – Cost of Capital Proceedings,” and in Note 4 of the Notes to Consolidated Financial Statements. The FERC regulates electric transmission rates, the transmission and wholesale sales of electricity in interstate commerce, transmission access, the rates of return on investments in electric transmission assets, and other similar matters involving SDG&E. These ratemaking mechanisms are subject to many risks similar to those described above regarding the CPUC. CPUC ratemaking proceedings. CPUC Authority Over Operational Matters The CPUC has regulatory authority related to safety standards and practices, competitive conditions, reliability and planning, affiliate relationships and a wide range of other operational matters, including citation programs concerning matters such as safety activity, disconnection and billing practices, resource adequacy and environmental compliance. For example, in June 2019, the CPUC opened an OII to determine whether SoCalGas’ and Sempra’s organizational culture and governance prioritize safety. Phase 1 of the OII involved a CPUC consultant producing a report that evaluates organizational culture, governance, policies, practices, and accountability metrics in relation to operations, including record of safety incidents. In January 2022, the CPUC issued a ruling initiating Phase 2 activities and entering the Phase 1 consultant’s report into the record. Consistent with the recommendations of the Phase 1 consultant’s report, the ruling indicates that Phase 2 will focus on constructive, forward-looking actions intended to improve safety outcomes in the future. Many of these standards and citation programs are becoming more stringent and could impose severe significant penalties, including enforcement programs under which the CPUC staff can issue citations that in some cases can impose substantial fines. The CPUC also continues to explore expansion of its programs to provide additional oversight. The CPUC conducts reviews and audits of the matters under its authority and could launch investigations or open proceedings at any time on any such matter it deems appropriate, the results of which could lead to citations, disallowances, fines and penalties, as well as corrective or mitigation actions required to address any noncompliance that may not be sufficiently funded in by customer rates or at all. Any such occurrence could have a material adverse effect on Sempra’s, SDG&E’s and SoCalGas’ results of operations, financial condition, cash flows and/or prospects. We discuss various CPUC proceedings relating to SDG&E and SoCalGas in Notes 4, 15 4 and 16 of the Notes to Consolidated Financial Statements. Potential Regulatory Changes and Influence of Other Organizations and Potential Regulatory Changes SDG&E, SoCalGas and Sempra may be materially adversely affected by revisions or reinterpretations of existing or new legislation, regulations, decisions, orders or interpretations of the CPUC, the FERC or other regulatory bodies, any of which could change how SDG&E and SoCalGas operate, affect their ability to recover various costs through rates or adjustment mechanisms, require them to incur additional expenses or otherwise materially adversely affect their and Sempra’s results of operations, financial condition, cash flows and/or prospects. SDG&E and SoCalGas are also affected by numerous advocacy groups, including California Public Advocates Office, The Utility Reform Network, Utility Consumers’ Action Network and the Sierra Club. Any success by any of these groups in directly or indirectly influencing regulatory bodies with authority over our their operations could have a material adverse effect on SDG&E’s, SoCalGas’ and Sempra’s results of operations, financial condition, cash flows and/or prospects.

Added · Removed · word-level comparison of the two filings

SoCalGas has incurred and may continue to incur significant costs, expenses and other liabilities related to the Leak.

rewrittenLitigationReframed Aliso Canyon Leak risk to detail $1.8 billion settlement with 36,000 plaintiffs, CPUC settlement agreement pending approval, exhausted directors' and officers' insurance, and remaining litigation by non-participating plaintiffs.

From October 23, 2015 through February 11, 2016, SoCalGas experienced the Leak, which we describe in Note 16 of the Notes to Consolidated Financial Statements.

Litigation In September 2021, SoCalGas and Sempra entered into an agreement with counsel to resolve lawsuits filed by approximately 36,000 plaintiffs (the Individual Plaintiffs) against SoCalGas and Sempra related to the Leak resulting in a payment of approximately $1.8 billion. The Individual Plaintiffs who do not participate in that settlement (the Remaining Individual Plaintiffs) will be able to continue to pursue their claims. As of February 21, 2023, lawsuits filed by the Remaining Individual Plaintiffs and several shareholder derivative actions are pending against SoCalGas related to the Leak, some of which have also named Sempra and/or certain officers and directors of SoCalGas and Sempra. Additional litigation may be filed against us related to the Leak or our responses to it.

The costs of defending against, settling or otherwise resolving the pending lawsuits or any new litigation could materially adversely affect SoCalGas’ and Sempra’s results of operations, financial condition, cash flows and/or prospects. We discuss these risks above under “Risks Related to All Sempra Businesses – Legal and Regulatory Risks” and in this risk factor below under “Estimated Costs, Insurance and Accounting and Other Impacts.”

Regulatory Proceedings SoCalGas has been subject to an OII to investigate and consider, among other things, what damages, fines or other penalties, if any, should be imposed against SoCalGas in connection with the Leak (the Leak OII). In October 2022, SoCalGas executed a settlement agreement with SED and the Public Advocates Office at the CPUC to resolve all aspects of the Leak OII, which is subject to CPUC approval. The settlement agreement provides for financial penalties, certain costs that SoCalGas will reimburse, a violation of California Public Utilities Code section 451, and costs previously incurred by SoCalGas for which it will not seek recovery from ratepayers, among other provisions.

Other investigations related to the Leak could result in additional findings of violations of laws, orders, rules or regulations as well as fines and penalties, any of which could involve substantial costs and cause reputational damage. In addition, SoCalGas may incur higher operating costs and additional capital expenditures as a result of new investigations or new laws, orders, rules and regulations arising out of this incident, or our responses thereto, which may not be recoverable through insurance or in customer rates. The occurrence of any of these risks could materially adversely affect SoCalGas’ and Sempra’s results of operations, financial condition, cash flows and/or prospects.

Natural Gas Storage Operations and Reliability In February 2017, the CPUC opened a proceeding pursuant to SB 380 OII to determine the feasibility of minimizing or eliminating the use of the Aliso Canyon natural gas storage facility while still maintaining energy and electric reliability for the region, including analyzing alternative means for meeting or avoiding the demand for the facility’s services if it were eliminated.

If the Aliso Canyon natural gas storage facility were to be permanently closed or if future cash flows from its operation were otherwise insufficient to recover its carrying value, we may record an impairment of the facility, which could be material, incur materially higher than expected operating costs and/or be required to make material additional capital expenditures (any or all of which may not be recoverable in rates), and natural gas reliability and electric generation could be jeopardized. Any such outcome could have a material adverse effect on SoCalGas’ and Sempra’s results of operations, financial condition, cash flows and/or prospects.

Cost Estimate, Insurance and Accounting and Other Impacts At December 31, 2022, SoCalGas estimates certain costs related to the Leak are $3,486 million (the cost estimate), including $1,279 million of costs recovered from insurance. Other than insurance for directors’ and officers’ liability, we have exhausted all of our insurance for this matter. We continue to pursue other sources of insurance coverage for costs related to this matter, but we may not be successful in obtaining additional insurance recovery for any of these costs. At December 31, 2022, $129 million of the cost estimate is accrued in Reserve for Aliso Canyon Costs and $4 million of the cost estimate is accrued in Deferred Credits and Other on SoCalGas’ and Sempra’s Consolidated Balance Sheets.

The civil litigation that remains pending against us related to the Leak seeks compensatory, statutory and punitive damages, restitution, and civil and administrative fines, penalties and other costs. We also could be subject to damages, fines or other penalties as a result of the pending regulatory investigation related to the Leak. Except for the amounts paid or estimated to settle certain pending legal and regulatory matters as we describe in Note 16 of the Notes to Consolidated Financial Statements, the cost estimate does not include any amounts necessary to resolve pending litigation or regulatory proceedings, other potential litigation or other costs, in each case to the extent it is not possible to predict at this time the outcome of these actions or reasonably estimate the possible costs or a range of possible costs.

Further, we are not able to reasonably estimate the possible loss or a range of possible losses in excess of the amounts accrued. The costs or losses not included in the cost estimate could be significant and could have a material adverse effect on SoCalGas’ and Sempra’s results of operations, financial condition, cash flows and/or prospects.

Compare with the 2022 10-K

Prior heading: SoCalGas has incurred and may continue to incur significant costs, expenses and other liabilities related to the Leak, a substantial portion of which may not be recoverable through insurance.

From October 23, 2015 through February 11, 2016, SoCalGas experienced a natural gas leak from one of the injection-and-withdrawal wells, SS25, at its Aliso Canyon natural gas storage facility in Los Angeles County. As further described Leak, which we describe in Note 16 of the Notes to Consolidated Financial Statements, numerous lawsuits, investigations Statements. Litigation In September 2021, SoCalGas and regulatory proceedings have been initiated in response Sempra entered into an agreement with counsel to resolve lawsuits filed by approximately 36,000 plaintiffs (the Individual Plaintiffs) against SoCalGas and Sempra related to the Leak, Leak resulting in significant costs. Civil Litigation As a payment of February 18, 2022, approximately 390 lawsuits, including approximately 36,000 plaintiffs, two consolidated class action complaints, claims for violations $1.8 billion. The Individual Plaintiffs who do not participate in that settlement (the Remaining Individual Plaintiffs) will be able to continue to pursue their claims. As of Proposition 65 February 21, 2023, lawsuits filed by the Remaining Individual Plaintiffs and several shareholder derivative actions are pending against SoCalGas related to the Leak, some of which have also named Sempra and/or certain officers and directors of SoCalGas and Sempra. Additional litigation, including by public entities, or criminal complaints litigation may be filed against us related to the Leak or our responses to it. All pending cases are coordinated before a single court in the LA Superior Court for pretrial management. Most of the lawsuits are the subject of an agreement entered into in September 2021 that would result in dismissal of the claims therein and releases by all participating plaintiffs of SoCalGas, Sempra and their respective affiliates from all claims related to the Leak. However, this agreement is subject to various conditions to effectiveness, including a minimum participation rate by the applicable plaintiffs and approvals by the LA Superior Court, which may not be satisfied. If these conditions are not satisfied, then the agreement will not become effective and all lawsuits subject to the agreement will remain pending. If these conditions are satisfied, then SoCalGas will be required to make payments of up to $1.8 billion to the participating plaintiffs. The two class action complaints are the subject of agreements also entered into in September 2021 that would result in dismissal of the claims therein and releases by plaintiffs and class members. One of these agreements requires approvals by the LA Superior Court, which may not be satisfied, in which case the complaint will remain pending. If the settlement is approved, then SoCalGas will be required to pay $40 million to a class of property owners. Sempra elected to make an $800 million equity contribution to SoCalGas in September 2021 and may elect to make additional equity contributions in the future that are intended to maintain SoCalGas’ approved capital structure in connection with the accruals related to these agreements. Such amounts, as well as the costs of defending against or against, settling or otherwise resolving the remaining pending lawsuits, including any lawsuits filed by plaintiffs or class or putative class members who do not agree to settle under or opt out of the agreements described above, and any compensatory, statutory or punitive damages, restitution, and civil, administrative and criminal fines, penalties and other costs, if awarded or imposed, new litigation could materially adversely affect SoCalGas’ and Sempra’s results of operations, financial condition, cash flows and/or prospects. We discuss these risks further above under “Risks Related to All Sempra Businesses – Legal and Regulatory Risks” and in this risk factor below under “Insurance “Estimated Costs, Insurance and Estimated Costs.” Governmental Investigations, Orders Accounting and Additional Regulation In June 2019, the CPUC opened Other Impacts.” Regulatory Proceedings SoCalGas has been subject to an OII to consider penalties against SoCalGas for the Leak. The first phase will investigate and consider, among other things, whether SoCalGas violated applicable laws, CPUC orders or decisions, rules or requirements and whether SoCalGas engaged in unreasonable and/or imprudent practices with respect to its operation and maintenance of the Aliso Canyon natural gas storage facility or its related record-keeping practices. The SED has alleged hundreds of violations in this first phase, asserting that SoCalGas violated California Public Utilities Code Section 451 and failed to cooperate in the investigation and to keep proper records. The second phase will consider whether SoCalGas should be sanctioned for the Leak and what damages, fines or other penalties, if any, should be imposed for any violations, unreasonable or imprudent practices, or failure to sufficiently cooperate against SoCalGas in connection with the Leak (the Leak OII). In October 2022, SoCalGas executed a settlement agreement with SED as determined by and the CPUC in Public Advocates Office at the first phase. In addition, CPUC to resolve all aspects of the second phase Leak OII, which is subject to CPUC approval. The settlement agreement provides for financial penalties, certain costs that SoCalGas will determine the ratemaking treatment or other disposition reimburse, a violation of California Public Utilities Code section 451, and costs previously incurred by SoCalGas in connection with the Leak, for which could result in little or no it will not seek recovery of such costs. SoCalGas has engaged in settlement discussions with the SED in connection with this proceeding. This OII and from ratepayers, among other provisions. Other investigations into related to the Leak could result in additional findings of violations of laws, orders, rules or regulations as well as fines and penalties, any of which could involve substantial costs and cause reputational damage. In addition, SoCalGas may incur higher operating costs and additional capital expenditures as a result of these new investigations or new laws, orders, rules and regulations arising out of this incident, or our responses thereto, which may not be recoverable through insurance or in customer rates. The occurrence of any of these risks could materially adversely affect SoCalGas’ and Sempra’s results of operations, financial condition, cash flows and/or prospects. Natural Gas Storage Operations and Reliability In February 2017, the CPUC opened a proceeding pursuant to SB 380 OII to determine the feasibility of minimizing or eliminating the use of the Aliso Canyon natural gas storage facility while still maintaining energy and electric reliability for the region, including considering analyzing alternative means for meeting or avoiding the demand for the facility’s services if it were eliminated. If the Aliso Canyon natural gas storage facility were to be permanently closed, closed or if future cash flows from its operation were otherwise insufficient to recover its carrying value, we may record an impairment of the facility facility, which could be impaired, material, incur materially higher than expected operating costs could be incurred and/or be required to make material additional capital expenditures may be required, any (any or all of which may not be recoverable in rates, rates), and natural gas reliability and electric generation could be jeopardized. Any such outcome could have a material adverse effect on SoCalGas’ and Sempra’s results of operations, financial condition, cash flows and/or prospects. Cost Estimate, Insurance and Estimated Costs Accounting and Other Impacts At December 31, 2021, 2022, SoCalGas estimates certain costs related to the Leak are $3,221 $3,486 million (the cost estimate), which includes the including $1,279 million of costs recovered or probable of recovery from insurance. This cost estimate Other than insurance for directors’ and officers’ liability, we have exhausted all of our insurance for this matter. We continue to pursue other sources of insurance coverage for costs related to this matter, but we may increase significantly as more information becomes available. A portion not be successful in obtaining additional insurance recovery for any of these costs. At December 31, 2022, $129 million of the cost estimate has been paid, and $1,983 million is accrued as in Reserve for Aliso Canyon Costs at December 31, 2021 and $4 million of the cost estimate is accrued in Deferred Credits and Other on SoCalGas’ and Sempra’s Consolidated Balance Sheets. The civil litigation that remains pending against us related to the Leak seeks compensatory, statutory and punitive damages, restitution, and civil and administrative fines, penalties and other costs. We also could be subject to damages, fines or other penalties as a result of the pending regulatory investigations and other matters investigation related to the Leak. Except for the amounts paid or estimated to settle certain pending legal and regulatory matters as described above, we describe in Note 16 of the Notes to Consolidated Financial Statements, the cost estimate does not include litigation, any amounts necessary to resolve pending litigation or regulatory proceedings proceedings, other potential litigation or other matters costs, in each case to the extent it is not possible to predict at this time the outcome of these actions or reasonably estimate the possible costs or a range of possible costs for damages, restitution, civil or administrative fines or penalties, defense, settlement or other costs or remedies that may be imposed or incurred. The cost estimate also does not include certain other costs incurred by Sempra associated with defending against shareholder derivative lawsuits and other potential costs that we currently do not anticipate incurring or that we cannot reasonably estimate. costs. Further, we are not able to reasonably estimate the possible loss or a range of possible losses in excess of the amounts accrued. These The costs or losses not included in the cost estimate could be significant and could have a material adverse effect on SoCalGas’ and Sempra’s results of operations, financial condition, cash flows and/or prospects. We have received insurance payments for many of the categories of costs included in the cost estimate, and we intend to pursue the full extent of our insurance coverage for the costs we have incurred. Other than insurance for certain future defense costs we may incur as well as directors’ and officers’ liability, we have exhausted all of our insurance in this matter. We continue to pursue other sources of insurance coverage for costs related to this matter, but we may not be successful in obtaining additional insurance recovery for any of these costs. If we are not able to secure additional insurance recovery, if any costs we have recorded as an insurance receivable are not collected, if there are delays in receiving insurance recoveries, or if the insurance recoveries are subject to income taxes while the associated costs are not tax deductible, such amounts, which could be significant, could have a material adverse effect on SoCalGas’ and Sempra’s results of operations, financial condition, cash flows and/or prospects.

Added · Removed · word-level comparison of the two filings

Any failure by the CPUC to adequately reform SDG&E’s rate structure could have a material adverse effect on SDG&E and Sempra.

rewrittenRegulatoryAdded details on Net Energy Metering 3.0 retail export compensation rates effective April 2023 and California's 2024 income-graduated fixed charge rulemaking; removed prior CPUC decline to adopt fixed charges.

The NEM program is an electric billing tariff mechanism designed to promote the installation of on-site renewable generation (primarily solar installations) for residential and business customers. Depending on when the on-site generation was installed, NEM customers receive a full retail rate or a reduced retail rate for energy they generate but do not use that is fed to the utility’s power grid, which results in these customers not paying their proportionate share of the cost of maintaining and operating the electric transmission and distribution system, subject to certain exceptions, but still receiving electricity from the system when their self-generation is inadequate to meet their electricity needs. As more and higher electric-use customers switch to NEM and self-generate energy, the burden on remaining non-NEM customers, who effectively subsidize the unpaid NEM costs, increases, which in turn encourages more self-generation and further increases rate pressure on remaining non-NEM customers.

The current electric residential rate structure in California is primarily based on consumption volume, which places a higher rate burden on customers with higher electric use while subsidizing lower-use customers. In August 2020, the CPUC initiated a rulemaking to further develop a successor to the existing NEM tariff. In November 2022, a previous proposed decision was withdrawn and a new proposed decision was issued, recommending substantial reform of the NEM program through the establishment of a new Net Billing Tariff that would apply to new net metered customers. The new Net Billing Tariff revises the current NEM structure for new customers with a retail export compensation rate that is better aligned with the value provided to the grid by behind-the-meter energy generation systems and retail import rates that encourage electrification and adoption of solar systems paired with storage.

The new Net Billing Tariff is designed to compensate customers for the value of their exports to the grid based on avoided cost. In December 2022, the CPUC approved the new Net Billing Tariff for customers who interconnect their qualifying on-site renewable generation after April 14, 2023. Additionally, in response to California legislation adopted in 2022, the CPUC has initiated a rulemaking to broadly restructure the way fixed costs are collected, moving from volumetric charges to an income-graduated fixed charge for default residential rates by July 1, 2024. The intent of such a fixed charge would be to further help reduce cost shifts through an equitable approach to the distribution of electric costs.

Depending on the effectiveness of the new Net Billing Tariff and any new rules related to fixed charges, which are uncertain, the risks associated with the existing NEM tariff could continue or increase.

SDG&E believes the establishment of a charge independent of consumption volume for residential customers is critical to help distribute rates among all customers that rely on the electric transmission and distribution system, including those participating in the NEM program. The absence of a charge independent of consumption volume coupled with the continuing increase of solar installation and other forms of self-generation, as well as the progression of DER and energy efficiency initiatives that could also reduce delivered volumes, could adversely impact electricity rates and the reliability of the electric transmission and distribution system. Any such impact could subject SDG&E to increased customer dissatisfaction, increased likelihood of noncompliance with CPUC or other safety or operational standards and increased risks attendant to any such noncompliance, as we discuss above, as well as increased costs, including power procurement, operating and capital costs, and potential disallowance of recovery for these costs.

If the CPUC does not continue to adequately reform SDG&E’s residential rate structure for all customers to better achieve reasonable, cost-based electric rates that are competitive with alternative sources of power and adequate to maintain the reliability of the electric transmission and distribution system, such failure could have a material adverse effect on SDG&E’s and Sempra’s results of operations, financial condition, cash flows and/or prospects.

Compare with the 2022 10-K

Prior heading: Any failure by the CPUC to adequately reform SDG&E’s rate structure could have a material adverse effect on SDG&E and Sempra.

The NEM program is an electric billing tariff mechanism designed to promote the installation of on-site renewable generation (primarily solar installations) for residential and business customers. Under Depending on when the current mechanism, on-site generation was installed, NEM customers receive a full retail rate or a reduced retail rate for energy they generate but do not use that is fed to the utility’s power grid, which results in these customers not paying their proportionate share of the cost of maintaining and operating the electric transmission and distribution system, subject to certain exceptions, but still receiving electricity from the system when their self-generation is inadequate to meet their electricity needs. As more and higher electric-use customers switch to NEM and self-generate energy, the burden on remaining non-NEM customers, who effectively subsidize the unpaid NEM costs, increases, which in turn encourages more self-generation and further increases rate pressure on remaining non-NEM customers. The current electric residential rate structure in California is primarily based on consumption volume, which places a higher rate burden on customers with higher electric use while subsidizing lower use customers. As of December 31, 2021, the CPUC has declined to adopt a fixed charge independent of consumption volume for residential lower-use customers. However, it has advised the utilities to renew their requests for a fixed charge at a later date if such proposals include an adequate customer outreach and communications plan. In August 2020, the CPUC initiated a rulemaking to further develop a successor to the existing NEM tariff. In December 2021, November 2022, a previous proposed decision was issued withdrawn and a new proposed decision was issued, recommending substantial reform of the NEM program through the establishment of a new Net Billing Tariff that would apply to new net metered customers. The new Net Billing Tariff revises the current NEM structure for new customers with a retail export compensation rate that is intended better aligned with the value provided to provide for the payment grid by behind-the-meter energy generation systems and retail import rates that encourage electrification and adoption of solar systems paired with storage. The new net metered Net Billing Tariff is designed to compensate customers for the value of their proportionate share of maintaining and operating exports to the electric transmission and distribution system, which, if grid based on avoided cost. In December 2022, the proposed decision is adopted, should reduce CPUC approved the cost-shifting burden from new net metered Net Billing Tariff for customers who interconnect their qualifying on-site renewable generation after April 14, 2023. Additionally, in response to non-NEM customers. California legislation adopted in 2022, the CPUC has initiated a rulemaking to broadly restructure the way fixed costs are collected, moving from volumetric charges to an income-graduated fixed charge for default residential rates by July 1, 2024. The timing intent of such a fixed charge would be to further help reduce cost shifts through an equitable approach to the final decision is uncertain. distribution of electric costs. Depending on the structure and functionality effectiveness of the new Net Billing Tariff, Tariff and any new rules related to fixed charges, which is are uncertain, the risks associated with the existing NEM tariff could continue or increase. SDG&E believes the establishment of a charge independent of consumption volume for residential customers is critical to help distribute rates among all customers that rely on the electric transmission and distribution system, including those participating in the NEM program. The absence of a charge independent of consumption volume coupled with the continuing increase of solar installation and other forms of self-generation, as well as the progression of distributed energy resources DER and energy efficiency initiatives that could also reduce delivered volumes, could adversely impact electricity rates and the reliability of the electric transmission and distribution system. Any such impact could subject SDG&E to increased customer dissatisfaction, increased likelihood of noncompliance with CPUC or other safety or operational standards and increased risks attendant to any such noncompliance, as we discuss above, as well as increased costs, including power procurement, operating and capital costs, and potential disallowance of recovery for these costs. If the CPUC fails does not continue to adequately reform SDG&E’s residential rate structure for all customers to better achieve reasonable, cost-based electric rates that are competitive with alternative sources of power and adequate to maintain the reliability of the electric transmission and distribution system, such failure could have a material adverse effect on SDG&E’s and Sempra’s results of operations, financial condition, cash flows and/or prospects.

Added · Removed · word-level comparison of the two filings

Operational and Structural Risks

Certain ring-fencing measures, governance mechanisms and commitments limit our ability to influence the management, operations and policies of Oncor.

unchangedConcentration

Various “ring-fencing” measures, governance mechanisms and commitments are in place that create legal and financial separation between Oncor Holdings, Oncor and their subsidiaries, on the one hand, and Sempra and its affiliates and subsidiaries, on the other hand. These measures are designed to enhance Oncor’s separateness from its owners and mitigate the risk that Oncor would be negatively impacted by a bankruptcy or other adverse financial development affecting its owners. These measures subject us and Oncor to various restrictions, including:

▪seven members of Oncor’s 13-person board of directors must be independent directors in all material respects under the rules of the NYSE in relation to Sempra and its affiliates and any other owners of Oncor, and also must have no material relationship with Sempra or its affiliates or any other owners of Oncor currently or within the previous 10 years; of the six remaining directors, two must be designated by Sempra, two must be designated by Oncor’s minority owner, TTI, and two must be current or former Oncor officers ▪Oncor will not pay dividends or other distributions (except for contractual tax payments) if (i) a majority of Oncor’s independent directors or any of the directors appointed by TTI determines that it is in the best interest of Oncor to retain such amounts to meet expected future requirements, (ii) the payment would cause Oncor’s debt-to-equity ratio to exceed the debt-to-equity ratio approved by the PUCT, or (iii) unless otherwise allowed by the PUCT, Oncor’s senior secured debt credit rating by any of the Rating Agencies falls below BBB (or Baa2 for Moody’s) ▪there must be certain “separateness measures” maintained to reinforce the legal and financial separation of Oncor from Sempra, including a requirement that dealings between Oncor and Sempra or Sempra’s affiliates (other than Oncor Holdings and its subsidiaries) must be on an arm’s-length basis, limitations on affiliate transactions and a prohibition on pledging Oncor assets or membership interests for any entity other than Oncor ▪a majority of Oncor’s independent directors and the directors designated by TTI that are present and voting (with at least one required to be present and voting) must approve any annual or multi-year budget if the aggregate amount of capital expenditures or O&M in the budget differs by more than 10% from the corresponding amounts in the budget for the preceding fiscal year or multi-year period, as applicable As a result of these measures, we do not control Oncor Holdings or Oncor, and we have limited ability to direct the management, policies and operations of Oncor Holdings and Oncor, including the deployment or disposition of their assets, declarations of dividends, strategic planning and other important matters.

We have limited representation on the Oncor Holdings and Oncor boards of directors, which are each controlled by independent directors. Moreover, all directors of Oncor, including the directors we have appointed, have considerable autonomy and have a duty to act in the best interest of Oncor consistent with the approved ring-fence and Delaware law, which may in some cases be contrary to our interests. To the extent the directors approve or Oncor otherwise pursues actions that are not in our interest, our results of operations, financial condition, cash flows and/or prospects may be materially adversely affected.

Industry-Related Risks

Changes in the regulation or operation of the electric utility industry and/or the ERCOT market, as well as the outcome of regulatory proceedings, could materially adversely affect Oncor, which could materially adversely affect us.

rewrittenRegulatoryBroadened Oncor risk to include regulatory proceedings outcomes, PUCT rate approval uncertainty, and distributed energy resource regulatory decisions affecting ERCOT market and Oncor's revenues.

Oncor operates in the electric utility industry and, as a result, it is subject to many of the same or similar risks as Sempra California as we describe above under “Risks Related to Sempra California,” particularly with respect to regulation by federal, state, and local legislative and regulatory authorities regarding rates and other financial matters as well as operational matters. Oncor operates in the ERCOT market. In ERCOT, rates are set by the PUCT based on a historical test year, and as a result, the rates Oncor is allowed to charge generally will not exactly match its costs at any given point in time and there is no assurance that it will be able to earn its full return on invested capital.

Further, the PUCT may not approve all items requested by Oncor in any rate proceeding, such as Oncor’s base rate review currently pending with the PUCT, including, among other things, recovery of all costs in rates, capital structure and authorized ROE. Failure to receive approval of its requests in any rate proceeding could adversely impact Oncor, which could adversely impact us, and those impacts could potentially be material.

The costs and burdens associated with complying with the various legislative and regulatory requirements to which Oncor is subject at the federal, state, and local levels and adjusting Oncor’s business and operations in response to legislative and regulatory developments, including changes in ERCOT, and any fines or penalties that could result from any noncompliance, may have a material adverse effect on Oncor. In addition, any economic weakness in the ERCOT market or slowing growth in Oncor’s service territory could lead to reduced electricity demand, which could materially adversely affect Oncor. Moreover, legislative, regulatory, market or industry activities could adversely impact Oncor’s collections and cash flows and jeopardize the predictability of utility earnings.

For instance, the PUCT has instituted various projects reviewing the regulatory framework regarding DER and other non-traditional technologies. As DER usage continues to grow, regulatory decisions made with respect to DER, including with respect to ERCOT market rules and transmission and distribution utilities’ ability to invest in non-traditional electricity delivery solutions, could adversely impact Oncor’s revenues and operations. If Oncor does not successfully respond to any legislative, regulatory, market or industry changes applicable to it, Oncor could suffer a deterioration in its results of operations, financial condition, cash flows and/or prospects, which could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Compare with the 2022 10-K

Prior heading: Changes in the regulation or operation of the electric utility industry and/or the ERCOT market could materially adversely affect Oncor, which could materially adversely affect us.

Oncor operates in the electric utility industry and, as a result, it is subject to many of the same or similar risks as Sempra California as we describe above under “Risks Related to Sempra California.” California,” particularly with respect to regulation by federal, state, and local legislative and regulatory authorities regarding rates and other financial matters as well as operational matters. Oncor operates in the ERCOT market. In particular, ERCOT, rates are set by the PUCT based on a historical test year, and as a result, the rates Oncor is allowed to charge generally will not exactly match its costs at any given point in time and there is no assurance that it will be able to earn its full return on invested capital. Further, the PUCT may not approve all items requested by Oncor in any rate proceeding, such as Oncor’s base rate review currently pending with the PUCT, including, among other things, recovery of all costs in rates, capital structure and authorized ROE. Failure to receive approval of its requests in any rate proceeding could adversely impact Oncor, which could adversely impact us, and those impacts could potentially be material. The costs and burdens associated with complying with the various legislative and regulatory requirements to which Oncor is subject at the federal, state, and local levels and adjusting Oncor’s business and operations in response to legislative and regulatory developments, including changes in ERCOT, and any fines or penalties that could result from any noncompliance, may have a material adverse effect on Oncor. In addition, Oncor operates any economic weakness in the ERCOT market and, as a result, any economic weakness or slowing growth in Oncor’s service territory could lead to reduced electricity demand in ERCOT demand, which could materially adversely affect Oncor. Moreover, legislative, regulatory, market or industry activities could adversely impact Oncor’s collections and cash flows and jeopardize the predictability of utility earnings, including temporary measures such as earnings. For instance, the approximately four-month long moratorium on customer disconnections due to nonpayment that was in place following an extreme winter weather event PUCT has instituted various projects reviewing the regulatory framework regarding DER and resulting power outages in February 2021, other actions taken by governmental authorities, customers or other third parties non-traditional technologies. As DER usage continues to address financial challenges following this event or other similar events, legislation affecting the ERCOT market grow, regulatory decisions made with respect to address issues DER, including with its operation during this event or other similar events or respect to improve grid reliability generally, or the growth of third-party distributed energy resources ERCOT market rules and other technologies that may increasingly compete with Oncor’s traditional transmission and distribution infrastructure utilities’ ability to invest in delivering non-traditional electricity to consumers. delivery solutions, could adversely impact Oncor’s revenues and operations. If Oncor does not successfully respond to any such legislative, regulatory, market or industry changes applicable to it, Oncor could suffer a deterioration in its results of operations, financial condition, cash flows and/or prospects, which could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Added · Removed · word-level comparison of the two filings

Oncor could have liquidity needs that necessitate additional investments.

rewrittenCredit & liquidityExpanded Oncor liquidity risk to emphasize capital spending expectations and challenges obtaining financing on reasonable terms.

Oncor’s business is capital-intensive, with significant capital spending expected in future periods, and it relies on external financing as a significant source of liquidity for its capital requirements. In the past, Oncor has financed much of its cash needs from operations and with proceeds from indebtedness, but these sources of capital may not be adequate or available on reasonable terms or at reasonable prices in the future. Because our commitments to the PUCT prohibit us from making loans to Oncor, we may elect to make capital contributions to Oncor if it fails to meet its capital requirements or is unable to access sufficient capital from other sources to finance its ongoing needs.

Any such investments could be substantial, would reduce the cash available to us for other purposes, and could increase our indebtedness, any of which could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Compare with the 2022 10-K

Prior heading: Oncor’s operations are capital-intensive, and it could have liquidity needs that necessitate additional investments.

Oncor’s business is capital-intensive, with significant capital spending expected in future periods, and it relies on external financing as a significant source of liquidity for its capital requirements. In the past, Oncor has financed much of its cash needs from operations and with proceeds from indebtedness, but these sources of capital may not be adequate or available on reasonable terms or at reasonable prices in the future. Because our commitments to the PUCT prohibit us from making loans to Oncor, we may elect to make additional capital contributions if to Oncor if it fails to meet its capital requirements or is unable to access sufficient capital from other sources to finance its ongoing needs. Any such investments could be substantial, would reduce the cash available to us for other purposes, and could increase our indebtedness, any of which could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Added · Removed · word-level comparison of the two filings

Sempra could incur substantial tax liabilities if EFH’s 2016 spin-off of Vistra is deemed to be taxable.

unchangedCredit & liquidity

As part of its ongoing bankruptcy proceedings, in 2016, EFH distributed all the outstanding shares of common stock of its subsidiary Vistra Energy Corp. (formerly TCEH Corp. and referred to herein as Vistra) to certain creditors of TCEH LLC (the spin-off), and Vistra became an independent, publicly traded company. Vistra’s spin-off from EFH was intended to qualify for partially tax-free treatment to EFH and its shareholders under Sections 368(a)(1)(G), 355 and 356 of the U.S. Internal Revenue Code of 1986 (as amended) (collectively referred to as the Intended Tax Treatment). In connection with and as a condition to the spin-off, EFH received a private letter ruling from the IRS regarding certain issues relating to the Intended Tax Treatment, as well as tax opinions from counsel to EFH and Vistra regarding certain aspects of the spin-off not covered by the private letter ruling.

In connection with the signing and closing of the merger of EFH (now Sempra Texas Holdings Corp. and a subsidiary of Sempra) with an indirect subsidiary of Sempra (the Merger), EFH sought and received a supplemental private letter ruling from the IRS and Sempra and EFH received tax opinions from their respective counsels that generally provide that the Merger will not affect the conclusions reached in, respectively, the IRS private letter ruling and tax opinions issued with respect to the spin-off described above. Similar to the IRS private letter ruling and opinions issued with respect to the spin-off, the supplemental private letter ruling is generally binding on the IRS and any opinions issued with respect to the Merger are based on factual representations and assumptions, as well as certain undertakings, made by Sempra and EFH.

If such representations and assumptions are untrue or incomplete, any such undertakings are not complied with, or the facts upon which the IRS supplemental private letter ruling or tax opinions (which will not impact the IRS position on the transactions) are based are different from the actual facts relating to the Merger, the tax opinions and/or supplemental private letter ruling may not be valid and could be challenged by the IRS. Even though Sempra Texas Holdings Corp. would have administrative appeal rights if the IRS were to invalidate its private letter ruling and/or supplemental private letter ruling, including the right to challenge any adverse IRS position in court, any such appeal would be subject to uncertainties and could fail.

If it is ultimately determined that the Merger caused the spin-off not to qualify for the Intended Tax Treatment, Sempra, through its ownership of Sempra Texas Holdings Corp., could incur substantial tax liabilities, which would materially reduce the value associated with our indirect investment in Oncor and could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

RISKS RELATED TO SEMPRA INFRASTRUCTURE

Project development activities may not be successful, projects under construction may not be completed on schedule or within budget, and completed projects may not operate at expected levels, any of which could materially adversely affect us.

unchangedOther

All Energy Infrastructure Projects We are involved in a number of energy infrastructure projects in various stages of development and construction, which subject us to numerous risks. Success in developing each project is contingent upon, among other things:

▪our financial condition and cash flows and other factors that impact our ability to invest sufficient funds in the project, including for preliminary activities that may need to be accomplished before we can determine whether the project is feasible or economically attractive ▪project assessment and design and our ability to foresee and incorporate new and developing trends and technologies in the energy industry, such as our pursuit of projects and design solutions to help enable our and our customers’ climate goals ▪our ability to reach a final investment decision or meet other milestones, which may be influenced by external factors outside our control, including the global economy and energy and financial markets, actions by regulators, achieving necessary internal and external approvals from project partners (if applicable) and others, and many of the other factors described in this risk factor ▪negotiation of satisfactory EPC agreements, including any renegotiation that may be required in the event of delays in final investment decisions or failures to meet other specified deadlines ▪progressing relationships from MOUs, HOAs or similar arrangements, which are non-binding and generally do not impose obligations on any of the parties, to execution of definitive agreements and participation in the project ▪identification of suitable partners, customers, suppliers and other necessary counterparties, negotiation of satisfactory equity, purchase, sale, supply, transportation and other appropriate commercial agreements, and satisfaction of any conditions to effectiveness of such agreements, including reaching a positive final investment decision within agreed timelines ▪timely receipt and maintenance of required governmental permits, licenses and other authorizations that do not impose material conditions and are otherwise granted under terms we find reasonable ▪our project partners’, contractors’ and other counterparties’ willingness and financial or other ability to make their required investments or fulfill their contractual commitments on a timely basis ▪timely, satisfactory and on-budget completion of construction, which could be negatively affected by engineering problems, work stoppages, unavailability or increased costs of materials, equipment, labor and commodities due to inflation or supply chain or other issues, contractor nonperformance and a variety of other factors, many of which we discuss above under “Risks Related to All Sempra Businesses – Operational Risks” and elsewhere in this risk factor ▪implementation of new or changes to existing laws or regulations that impact our infrastructure or the energy sector generally ▪obtaining adequate and reasonably priced financing for the project, particularly in light of rising inflation and interest rates ▪the absence of hidden defects or inherited environmental liabilities for the site of the project ▪fast and cost-effective resolution of any litigation or unsettled property rights affecting the project ▪geopolitical events and other uncertainties, such as the war in Ukraine Any failures with respect to the above factors or other factors material to any particular project could involve additional costs, otherwise negatively affect our ability to successfully complete the project and force us to impair or write off amounts we have invested in the project.

If we are unable to complete a development project, if we experience delays, or if construction, financing or other project costs exceed our estimated budgets and we are required to make additional capital contributions, we may never recover or receive an adequate or any return on our investment and other resources expended on the project and our results of operations, financial condition, cash flows and/or prospects could be materially adversely affected.

The operation of existing facilities and any future projects we are able to complete involves many risks, including the potential for unforeseen design flaws, engineering challenges, equipment failures or the breakdown for other reasons of facilities, equipment or processes; labor disputes; fuel interruption; environmental contamination; and the other operational risks that we discuss above under “Risks Related to All Sempra Businesses – Operational Risks.” Any of these events could lead to our facilities being idle for an extended period of time or operating below expected levels, which may result in lost revenues or increased expenses, including higher maintenance costs and penalties. Any such occurrence could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

LNG Export Projects In addition to the risks described above that are applicable to all our energy infrastructure projects, we are exposed to additional risks in connection with our LNG export projects, including the ECA LNG Phase 1 project under construction and our potential development of additional LNG export facilities. We discuss our LNG export projects in “Part II – Item 7. MD&A – Capital Resources and Liquidity – Sempra Infrastructure.” Each of these projects faces numerous risks. Our ability to reach a final investment decision for each project and, if a positive decision is made and a project is completed, the overall success of the project are dependent on global energy markets, including natural gas and oil supply, demand and pricing, the ability to reach advantageous agreements with our counterparties, including our partners, off-takers, and EPC contractors, risks inherent in construction, and the ability to obtain and maintain government approvals, among other things.

In general, depressed natural gas and LNG prices in the markets we intend to serve due to shifts in supply or other factors could reduce the pricing and cost advantages of exporting domestically produced natural gas and LNG, which could lead to decreased demand. In addition, global oil prices and their associated current and forward projections could reduce demand for natural gas and LNG in some sectors. Although demand for natural gas is currently strong due to the geopolitical consequences of the war in Ukraine and increased recognition of the importance of energy security, a reduction in natural gas demand could also occur from higher penetration of alternative fuels in new power generation, or as a result of calls by some to limit or eliminate reliance on natural gas as an energy source globally.

Oil prices could also make LNG projects in other parts of the world more feasible and competitive with LNG projects in North America, thus increasing supply and competition for any available LNG demand. Moreover, because LNG projects take a number of years to develop and construct, it is difficult to match current and expected demand with the projected supply from projects under development. Any of these occurrences could impact competition and prospects for developing LNG export projects and negatively affect the performance and prospects of any of our projects that are or become operational.

Our projects may face distinct disadvantages relative to some LNG projects being pursued by other project developers, including:

▪The proposed Cameron LNG Phase 2 project is subject to certain restrictions and conditions under the financing agreements for the Cameron LNG Phase 1 facility and requires unanimous consent of all JV members, including with respect to the equity investment obligations of each partner. We may not be able to satisfy these conditions and requirements, in which case our ability to develop the Cameron LNG Phase 2 project would be jeopardized.

▪The ECA LNG projects under construction and in development are subject to ongoing land and permit disputes that could obstruct efforts to find or maintain suitable partners, customers and financing arrangements and hinder or halt construction and, if the projects are completed, operations. We discuss these risks below and under “Risks Related to Sempra Infrastructure – Legal Risks.” In addition, the Mexican regulatory process and overlay of U.S. regulation for natural gas exports to LNG facilities in Mexico are not well developed, which, among other factors, contributed to delays obtaining a necessary permit from the Mexican government for the ECA LNG Phase 1 project and could cause similar delays or other hurdles in the future and lead to difficulties finding or maintaining suitable partners, customers and financing arrangements.

We have entered into contracts with affiliates and third parties, subject to certain conditions, to supply and transport gas across the U.S.-Mexico border to meet the requirements of the ECA LNG Phase 1 project if and when it becomes operational. If affiliates or third parties experience delays or fail to obtain and maintain necessary permits and arrangements to provide such supply or transportation services or if we fail to maintain adequate gas supply and transportation agreements to support the project fully, it could cause additional costs or delays to the ECA LNG Phase 1 project. Finally, although we have planned measures to not disrupt operations at the ECA Regas Facility with the construction or operation of the ECA LNG Phase 1 project, these measures may not be effective.

Moreover, we expect construction of the proposed ECA LNG Phase 2 project to conflict with ECA Regas Facility operations, making the decisions on whether, when and how to pursue the ECA LNG Phase 2 project dependent in part on whether the investment in this project would, over the long term, be more beneficial than continuing to provide regasification services under existing contracts for 100% of the ECA Regas Facility’s capacity through 2028.

▪The PA LNG projects in development are to be located at a greenfield site and therefore are subject to disadvantages relative to projects being developed at brownfield sites, including increased time and costs to develop and construct the project.

Development of these or any other LNG export projects will depend on the ability of our existing pipeline interconnections to be expanded or the ability to permit and construct new pipeline facilities, each of which may require us to enter into additional pipeline interconnection agreements with third-party pipelines. We and third parties may not be able to successfully develop and construct such new pipeline facilities, or we may not be able to secure such additional pipeline interconnections on commercially reasonable terms or at all.

The capital requirements for LNG export projects that we decide to pursue can be significant, even if we ultimately decide not to make a positive final investment decision. In addition, our proposed facilities may not be completed in accordance with estimated timelines or budgets or at all as a result of the above or other factors, and delays, cost overruns or our inability to complete one or more of these projects could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

Financing Arrangements We may become involved in various financing arrangements with respect to any of our energy infrastructure projects, such as guarantees, indemnities or loans. These arrangements could expose us to additional risks, including exposure to losses upon the occurrence of certain events related to the development, construction, operation or financing of the applicable projects that could have a material adverse effect on our future results of operations, financial condition, cash flows and/or prospects.

We are dependent on the equipment provided by third parties to operate the Cameron LNG Phase 1 facility and the failure of such equipment may adversely impact our business and performance.

unchangedSupply chain

Cameron LNG JV has experienced operating issues with equipment provided by third-party vendors, which have caused reductions in operating capacity and the declaration of force majeure events by Cameron LNG JV under its tolling agreements for its Cameron LNG Phase 1 facility. Certain of Cameron LNG JV’s customers have raised objections regarding these force majeure declarations, and Cameron LNG JV’s customers may raise objections in the future regarding these declarations or other force majeure declarations for similar operating issues. Cameron LNG JV’s customers have obtained certain, and may in the future obtain additional, quantities of excess LNG production in connection with these and certain other force majeure events, and future force majeure events may also lead to the additional accrual of similar rights.

The requirement to deliver excess LNG production to these customers in connection with these force majeure events has had, and in the future could have, an adverse impact on Sempra Infrastructure’s and our business and cash flows because Cameron LNG JV loses fees related to the excess production.

These and other operational issues arising from equipment or facilities provided by third-party vendors may require us to undertake remediation, repair or equipment replacement activities that could result in reductions or cessations in production from our facilities. Although we are seeking to enforce warranty and other claims against our EPC contractors and other equipment vendors and suppliers, we may face challenges in successfully enforcing these claims against these third parties. Any such occurrence could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

Fixed-price long-term contracts for services or commodities expose our businesses to inflationary pressures.

unchangedMacro & demand

Sempra Infrastructure seeks to secure long-term contracts for services and commodities in an effort to optimize the use of its facilities, reduce volatility in earnings and support the construction of new infrastructure. If these contracts are at fixed prices, their profitability may be negatively affected by inflationary pressures, including increased labor, materials, equipment, commodities and other operational costs, rising interest rates that affect financing costs and changes in applicable exchange rates. We may try to mitigate these risks by, among other things, using variable pricing tied to market indices, anticipating and providing for cost escalation when bidding on projects, contracting for direct pass-through of operating costs and/or entering into hedges.

However, these measures may not fully or substantially offset any increases in operating expenses or financing costs caused by inflationary pressures and their use could introduce additional risks, any of which could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

Increased competition could materially adversely affect us.

unchangedCompetition

The markets in which we operate are characterized by numerous strong and capable competitors, many of which have extensive and diversified development and/or operating experience domestically and internationally and financial resources similar to or greater than ours. In particular, the natural gas pipeline, storage and LNG market segments recently have been characterized by strong and increasing competition for winning new development projects and acquiring existing assets. In addition, our Mexican natural gas distribution business faces increased competition now that its former exclusivity period with respect to its distribution zones has expired and other distributors are legally permitted to build and operate natural gas distribution systems and compete to attract customers in the locations where it operates. These competitive factors could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

We may not be able to enter into, maintain, extend or replace long-term supply, sales or capacity agreements.

rewrittenConcentrationRemoved detailed disclosure of Shell Mexico and Gazprom dispute at ECA Regas Facility; generalized to future supply agreement risks.

The ECA Regas Facility has long-term capacity agreements with a limited number of counterparties, and also may enter into short-term and/or long-term supply agreements to purchase LNG to be received, stored and regasified for sale to other parties. In addition, Cameron LNG JV has long-term liquefaction and regasification tolling agreements with three counterparties that collectively subscribe for the full nameplate capacity of the Cameron LNG Phase 1 facility. The long-term nature of these agreements and the small number of customers at each of these facilities exposes us to risks, including increased risk if these counterparties fail to meet their contractual obligations on a timely basis, increased credit risks, and risks associated with the long-term nature of our relationships with these counterparties, including increased impacts of disputes or other similar issues which we have experienced in the past.

Any such issues that arise in the future with respect to our long-term contracts, including any that may be caused by or related to the war in Ukraine, could lead to significant legal and other costs, result in cancelation of certain key contracts or otherwise adversely affect our relationships with long-term customers, suppliers or partners, and could negatively impact the reliability of revenues from the applicable projects and the prospects for any implicated development projects. Any such event could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

Sempra Infrastructure’s ability to enter into new or replace existing long-term capacity agreements for its natural gas pipeline operations is dependent on, among other factors, demand for and supply of LNG and/or natural gas from its transportation customers, which may include our LNG export facilities. A decrease in demand for or supply of LNG or natural gas from such customers or the occurrence of other events that hinder Sempra Infrastructure from maintaining such agreements or establishing new ones could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

The electric generation and wholesale power sales industries are highly competitive. As more plants are built, supplies of energy and related products may exceed demand, competitive pressures may increase and wholesale electricity prices may decline or become more volatile. Without long-term power sales agreements, our revenues may be subject to increased volatility, and we may be unable to sell the power that Sempra Infrastructure’s facilities are capable of producing or sell it at favorable prices, any of which could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Compare with the 2022 10-K

Prior heading: We may not be able to enter into, maintain, extend or replace long-term supply, sales or capacity agreements.

The ECA Regas Facility has long-term capacity agreements with a limited number of counterparties, and also may enter into short-term and/or long-term supply agreements to purchase LNG to be received, stored and regasified for sale to other parties. In addition, Cameron LNG JV has long-term liquefaction and regasification tolling capacity agreements with three counterparties that collectively subscribe for the full nameplate capacity of its the Cameron LNG Phase 1 facility. The long-term nature of these agreements and the small number of customers at each of these facilities exposes us to risks, including increased risk if these counterparties fail to meet their contractual obligations on a timely basis, increased credit risks, and risks associated with the long-term nature of our relationships with these counterparties. We are currently engaged in a legal dispute with the two third-party capacity customers, Shell Mexico and Gazprom, at the ECA Regas Facility involving breach of contract claims, a constitutional challenge of the CRE’s approval counterparties, including increased impacts of the general terms and conditions for service at the facility, and proceedings seeking to modify disputes or revoke certain material permits needed by the facility and the proposed ECA LNG projects. We discuss this dispute other similar issues which we have experienced in Note 16 of the Notes to Consolidated Financial Statements. These challenges and proceedings or any similar or other past. Any such issues that arise in the future with respect to these or our other long-term contracts, including any that may be caused by or related to the conflict war in Ukraine, could lead to significant legal and other costs, result in cancelation of certain key contracts or otherwise adversely affect our relationships with long-term customers, suppliers or partners, and could negatively impact the reliability of revenues from the applicable projects and the prospects for any implicated development projects. Any such event could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. Sempra Infrastructure’s ability to enter into new or replace existing long-term capacity agreements for its natural gas pipeline operations is dependent on, among other factors, demand for and supply of LNG and/or natural gas from its transportation customers, which may include our LNG export facilities. A decrease in demand for or supply of LNG or natural gas from such customers or the occurrence of other events that hinder Sempra Infrastructure from maintaining such agreements or establishing new ones could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. The electric generation and wholesale power sales industries are highly competitive. As more plants are built, supplies of energy and related products may exceed demand, competitive pressures may increase and wholesale electricity prices may decline or become more volatile. Without long-term power sales agreements, our revenues may be subject to increased volatility, and we may be unable to sell the power that Sempra Infrastructure’s facilities are capable of producing or sell it at favorable prices, any of which could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Added · Removed · word-level comparison of the two filings

We rely on transportation assets and services, much of which we do not own or control, to deliver natural gas and electricity.

unchangedSupply chain

We depend on electric transmission lines, natural gas pipelines and other transportation facilities and services owned and operated by third parties to, among other things:

▪deliver the natural gas, LNG, electricity and LPG we sell to customers or use for our LNG export facilities ▪supply natural gas to our gas storage and electric generation facilities ▪provide retail energy services to customers If transportation is disrupted, if the construction of new or modified interconnecting infrastructure is not completed on schedule or if capacity is inadequate, we may not be able to move forward with our projects on schedule, we may be unable to sell and deliver our commodities, electricity and other services to our customers, we may be responsible for damages incurred by these customers, such as the cost of acquiring alternative supplies at then-current spot market rates, and we could lose customers that may be difficult to replace in competitive market conditions. Any such occurrence could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

Our international businesses and operations expose us to foreign currency and inflation risks.

unchangedMacro & demand

Our operations in Mexico pose foreign currency and inflation risks. Exchange and inflation rates with respect to the Mexican peso and fluctuations in those rates may have an impact on the revenue, costs and cash flows from our international operations, which could materially adversely affect our results of operations, financial condition, cash flows and/or prospects. We may attempt to hedge cross-currency transactions and earnings exposure through various means, including financial instruments and short-term investments, but these hedges may not fully achieve our objectives of mitigating earnings volatility that would otherwise occur due to exchange rate fluctuations. Because we do not hedge our net investments in foreign countries, we are susceptible to volatility in OCI caused by exchange rate fluctuations for entities whose functional currencies are not the U.S. dollar.

Moreover, Mexico has experienced periods of high inflation and exchange rate instability in the past, and severe devaluation of the Mexican peso could result in governmental intervention to institute restrictive exchange control policies, as has occurred before in Mexico and other Latin American countries. We discuss our foreign currency exposure at our Mexican subsidiaries in “Part II – Item 7. MD&A” and “Part II – Item 7A. Quantitative and Qualitative Disclosures About Market Risk.”

Our businesses are exposed to market risks, including fluctuations in commodity prices, that could materially adversely affect us.

unchangedMacro & demand

We buy energy-related commodities from time to time for pipeline operations, LNG facilities or power plants to satisfy contractual obligations with customers. The regional and other markets in which we purchase these commodities are competitive and can be subject to significant pricing volatility as a result of many factors, including adverse weather conditions, supply and demand changes, availability of competitively priced alternative energy sources, commodity production levels and storage capacity, energy and environmental legislation and regulations, and economic and financial market conditions. Our results of operations, financial condition, cash flows and/or prospects could be materially adversely affected if the prevailing market prices for natural gas, LNG, electricity or other commodities we buy change in a direction or manner not anticipated and for which we have not provided adequately through purchase or sale commitments or other hedging transactions.

Our international businesses and operations expose us to increased legal, regulatory, tax, economic, geopolitical and management oversight risks and challenges.

rewrittenGeopolitical & warAdded Mexico's rejected 2022 constitutional reform to centralize electricity market and future reform risks; expanded midstream/downstream permit and LDA authorization risks; removed prior discussion of specific 2023 LDA renewal deadlines.

Overview We own or have interests in a variety of energy infrastructure assets in Mexico, and we do business with companies based in foreign markets, including particularly our LNG export operations. Conducting these activities in foreign jurisdictions subjects us to complex management, security, political, legal, economic and financial risks that vary by country, many of which may differ from and potentially be greater than those associated with our wholly domestic businesses, and the occurrence of any of these risks could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. These risks include the following and the other risks discussed in this risk factor below:

▪compliance with tax, trade, environmental and other foreign laws and regulations, including legal limitations on ownership in some foreign countries and inadequate or inconsistent enforcement of regulations ▪actions by local regulatory bodies, including setting rates and tariffs that may be earned by or charged to our businesses ▪adverse changes in social, political, economic or market conditions or the stability of foreign governments ▪adverse rulings by foreign courts or tribunals; challenges to or difficulty obtaining, maintaining and complying with permits or approvals; difficulty enforcing contractual and property rights; differing legal standards for lawsuits or other proceedings; and unsettled property rights and titles in Mexico ▪expropriation or theft of assets ▪with respect to our non-utility international business activities, changes in the priorities and budgets of international customers, which may be driven by many of the factors listed above, among others Mexican Government Influence on Economic and Energy Matters The Mexican government exercises significant and increasing influence over the Mexican economy and energy sector and has adopted or proposed additional changes that, in each case, could fundamentally impact private investment in this sector.

Mexican governmental actions in the past several years in the electricity market include resolutions, orders, decrees, regulations and proposed and adopted amendments to Mexican law that could, among other things, threaten the prospects for private-party renewable energy generation in the country, limit the ability to dispatch renewable energy and receive or maintain operational permits, and increase costs of electricity for legacy renewables and cogeneration energy contract holders. The President of Mexico also proposed constitutional reform in September 2021 that would have eliminated the wholesale electricity market in Mexico and significantly limited the ability of private parties to participate in electricity generation. Although the proposed constitutional reform did not reach the two-third majority required for its approval and was therefore rejected by Mexico’s Chamber of Deputies, other similar reforms to centralize and de-privatize the electricity market in Mexico could be proposed in the future.

With respect to midstream and downstream activities, amendments to Mexico’s Hydrocarbons Law that give SENER and the CRE additional powers to suspend and revoke permits became effective in May 2021. The amendments provide that suspension of permits will be determined by SENER or the CRE when a danger to national security, energy security, or the national economy is foreseen, and also provide new grounds for the revocation of permits under certain other circumstances related to a permit holder’s use of illegally imported products, failure to comply with provisions applicable to quantity, quality and measurement of products, or unauthorized modification of the technical condition of its infrastructure. Additionally, the amendments direct authorities to revoke permits that fail to comply with certain minimum storage and other requirements or violate provisions established by SENER or the amended Hydrocarbons Law, as applicable.

We discuss these Mexican governmental actions in Note 16 of the Notes to Consolidated Financial Statements. We cannot predict whether proposed governmental actions will ultimately be passed or otherwise become effective in their current forms, nor can we predict the nature or level of their impact on the various segments of the energy sector in which we participate. We also cannot predict whether pending actions to enjoin enforcement or suspend or overturn existing laws and other governmental actions will be successful. More generally, we cannot predict the impact that the political, social and judicial landscape in Mexico will have on that country’s economy and energy sector and our business in Mexico.

If any of the proposed governmental actions are passed or otherwise become effective, if efforts to enjoin enforcement or suspend or overturn adopted governmental actions fail, or if other similar moves by the Mexican government are taken to curb private-party participation in the energy sector, including through further amendments to Mexican laws, rules or the constitution or increased investigative and enforcement activities, it may impact our ability to operate our facilities at existing levels or at all, may result in increased costs for Sempra Infrastructure and its customers, may adversely affect our ability to develop new projects, may result in decreased revenues and cash flows, and may negatively impact our ability to recover the carrying values of our investments in Mexico, any of which may have a material adverse effect on our business, results of operations, financial condition, cash flows and/or prospects.

U.S. and Mexican Laws and Foreign Policy, including Trade and Related Matters Our international business activities are subject to U.S. and Mexican laws and regulations related to foreign operations or doing business internationally, including the U.S. Foreign Corrupt Practices Act, the Mexican Federal Anticorruption Law in Public Contracting (Ley Federal Anticorrupción en Contrataciones Públicas) and similar laws, and are sensitive to U.S. and Mexican foreign policy, trade policy and other geopolitical factors. The current and the last U.S. Administrations have taken different stances with respect to international trade agreements, tariffs, immigration policy and other matters of foreign policy that impact trade and foreign relations. Shifts in foreign policy could result in or increase adverse effects on our businesses and create uncertainty, making it difficult to predict the impact these policies could have on our businesses.

Violations or alleged violations of the laws referred to above, as well as foreign policy positions that adversely affect imports and exports between the U.S., Mexican and other economies and foreign companies with whom we conduct business, could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Compare with the 2022 10-K

Prior heading: Our international businesses and operations expose us to increased legal, regulatory, tax, economic, geopolitical and management oversight risks and challenges.

Overview We own or have interests in a variety of energy infrastructure assets in Mexico, and we do business with companies based in foreign markets, including particularly our LNG export operations. Conducting these activities in foreign jurisdictions subjects us to complex management, security, political, legal, economic and financial risks that vary by country, many of which may differ from and potentially be greater than those associated with our wholly domestic businesses, and the occurrence of any of these risks could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. These risks include the following and the other risks discussed in this risk factor below: ▪tax, ▪compliance with tax, trade, environmental and other foreign laws and regulations and compliance with them, regulations, including legal limitations on ownership in some foreign countries and inadequate or inconsistent enforcement of regulations ▪actions by local regulatory bodies, including setting rates and tariffs that may be earned by or charged to our businesses ▪adverse changes in social, political, economic or market conditions or the stability of foreign governments ▪adverse rulings by foreign courts or tribunals; challenges to or difficulty obtaining, maintaining and complying with permits or approvals; difficulty enforcing contractual and property rights; differing legal standards for lawsuits or other proceedings; and unsettled property rights and titles in Mexico ▪expropriation or theft of assets ▪with respect to our non-utility international business activities, changes in the priorities and budgets of international customers, which may be driven by many of the factors listed above, among others Mexican Government Influence on Economic and Energy Matters The Mexican government has exercised, and continues to exercise, exercises significant and increasing influence over the Mexican economy and energy sector and is proposing has adopted or proposed additional changes that, in each case, could fundamentally impact private investment in this sector. With respect to the electricity market, the Mexican legislature is currently considering proposed constitutional reform that would, among other things, make the CFE the only entity allowed to commercialize electric energy in Mexico, thereby eliminating the wholesale electricity market entirely. This reform would also limit the overall capacity and types of plants eligible to generate electricity for the CFE to commercialize, resulting in the cancelation of electricity generation permits and contracts for the sale of electricity to the CFE, including permits at all of Sempra Infrastructure’s operational power generation facilities. Recent Mexican governmental actions in the past several years in the electricity market also include resolutions, orders, decrees, regulations and proposed and adopted amendments to Mexican law that could, among other things, threaten the prospects for private-party renewable energy generation in the country; country, limit the ability to dispatch renewable energy and receive or maintain operational permits; permits, and increase costs of electricity for legacy renewables and cogeneration energy contract holders. With respect to midstream and downstream activities, recent governmental actions include amendments in June, October, and November holders. The President of Mexico also proposed constitutional reform in September 2021 to Mexico’s General Foreign Trade Rules that establish additional requirements for obtaining authorizations for the import and export of hydrocarbons, refined products, petrochemicals, and biofuels through channels other than those authorized (LDA authorizations). The ECA Regas Facility and the Veracruz terminal would have LDA authorizations that are valid through 2023, although eliminated the ability to subsequently renew these authorizations may be wholesale electricity market in Mexico and significantly limited by these amended rules. We are assessing the effect of these amended rules on our operations and development ability of future projects, including those private parties to participate in electricity generation. Although the vicinity proposed constitutional reform did not reach the two-third majority required for its approval and was therefore rejected by Mexico’s Chamber of Topolobampo, Manzanillo Deputies, other similar reforms to centralize and Ensenada, as well as de-privatize the electricity market in Mexico could be proposed ECA LNG liquefaction projects. In addition, in the future. With respect to midstream and downstream activities, amendments to Mexico’s Hydrocarbons Law that give SENER and the CRE additional powers to suspend and revoke permits were published became effective in May 2021. While the courts have enjoined enforcement of these amendments pending a final disposition in the case of several of our projects, the The amendments provide that suspension of permits will be determined by SENER or the CRE when a danger to national security, energy security, or the national economy is foreseen, and also provide new grounds for the revocation of permits under certain circumstances. Additionally, in other circumstances related to a permit holder’s use of illegally imported products, failure to comply with provisions applicable to quantity, quality and measurement of products, or unauthorized modification of the case technical condition of existing permits, its infrastructure. Additionally, the amendments direct authorities to revoke permits that fail to comply with the certain minimum storage requirements established by SENER or fail to comply with and other requirements or violate provisions established by SENER or the amended Hydrocarbons Law. Finally, Law, as part of an industrywide audit and investigative process initiated by the CRE to enforce fuel procurement laws, federal prosecutors conducted inspections at several refined products terminals, including Sempra Infrastructure’s refined products terminal in Puebla, to confirm that the gasoline and/or diesel in storage were legally imported. During the inspection of the Puebla terminal in September 2021, a federal prosecutor took samples from all the train and storage tanks in the terminal and ordered that the facility be temporarily shut down during the pendency of the analysis of the samples and investigation, while leaving the terminal in Sempra Infrastructure’s custody. In addition, in November 2021, the CRE notified Sempra Infrastructure of the commencement of an administrative proceeding for revoking the storage permit at the Puebla terminal due to alleged breach of its terms and conditions. We cannot predict when the investigation will be completed, the outcome of the administrative proceeding or whether and/or when the facility will be able to commence commercial operations. applicable. We discuss these Mexican governmental actions further in Note 16 of the Notes to Consolidated Financial Statements. We cannot predict whether proposed changes like the constitutional reform to the electricity market or other similar governmental actions will ultimately be passed or otherwise become effective in their current forms, nor can we predict the nature or level of their impact of this constitutional reform on non-electric the various segments of the energy sector. sector in which we participate. We also cannot predict whether pending actions to enjoin enforcement or suspend or overturn existing laws and other governmental actions will be successful. More generally, we cannot predict the impact that the political, social, social and judicial landscape in Mexico will have on that country’s economy and energy sector and our business in Mexico. If any of the recent Mexican proposed governmental actions are passed or otherwise become effective, if efforts to enjoin their enforcement or suspend or overturn them adopted governmental actions fail, or if other similar moves by the Mexican government are taken to curb private-party participation in the energy sector, including the passage of additional laws through further amendments to Mexican laws, rules or regulations the constitution or increased investigative and enforcement activities, this could materially it may impact our ability to operate our facilities at existing levels or at all, may result in increased costs for Sempra Infrastructure and its customers, may adversely affect our ability to develop new projects, may result in decreased revenues and cash flows, and may negatively impact our ability to recover the carrying values of our investments in Mexico, any of which may have a material adverse effect on our business, results of operations, financial condition, cash flows and/or prospects. U.S. and Mexican Laws and Foreign Policy, including Trade and Related Matters Our international business activities are subject to U.S. and Mexican laws and regulations related to foreign operations or doing business internationally, including the U.S. Foreign Corrupt Practices Act, the Mexican Federal Anticorruption Law in Public Contracting (Ley Federal Anticorrupción en Contrataciones Públicas) and similar laws, and are sensitive to U.S. and Mexican foreign policy, trade policy and other geopolitical factors. The current and the last U.S. Administrations have taken different stances with respect to international trade agreements, tariffs, immigration policy and other matters of foreign policy that impact trade and foreign relations. Shifts in foreign policy could result in or increase the adverse effects on our businesses and create uncertainty, making it difficult to predict the impact these policies could have on our businesses. Violations or alleged violations of the laws referred to above, as well as foreign policy positions that adversely affect imports and exports between the U.S., Mexican and other economies and foreign companies with whom we conduct business, could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Added · Removed · word-level comparison of the two filings

Our businesses are subject to various legal actions challenging our property rights and permits, and our properties in Mexico could be subject to expropriation by the Mexican government.

rewrittenLitigationRewritten to emphasize property rights challenges and Mexican expropriation risk; removed detailed consequences of losing property rights or permits.

We are engaged in disputes regarding our title to the property in Mexico where our ECA Regas Facility is situated and our ECA LNG projects under construction and in development are expected to be situated, which we discuss in Note 16 of the Notes to Consolidated Financial Statements. In addition, we may have or seek to obtain long-term leases or rights-of-way from governmental agencies or other third parties to operate our energy infrastructure on land we do not own. In addition to the risks associated with such property ownership and use that we describe above under “Risks Related to All Sempra Businesses – Operational Risks,” disputes regarding any of these properties could lead to difficulties finding or maintaining suitable partners, customers and project financing arrangements and could hinder or halt our ability to construct and, if completed, operate the affected facilities or proposed projects. Any of these outcomes could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects.

Sempra Infrastructure’s energy infrastructure assets may be considered by the Mexican government to be a public service or essential for the provision of a public service, in which case these assets and the related businesses could be subject to expropriation or nationalization, loss of concessions, renegotiation or annulment of existing contracts, and other similar risks. Any such occurrence could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Compare with the 2022 10-K

Prior heading: Our businesses are subject to various legal actions challenging our property rights and permits, and our properties in Mexico could be subject to expropriation by the Mexican government.

We are engaged in disputes regarding our title to the property in Mexico where our ECA Regas Facility is situated and our proposed ECA LNG projects under construction and in development are expected to be situated, which we discuss in Note 16 of the Notes to Consolidated Financial Statements. In addition, we may have or seek to obtain long-term leases or rights-of-way from governmental agencies or other third parties to operate our energy infrastructure located on land we do not own for a specific period of time. If we are unable to defend and retain title to the properties we own or if we are unable to obtain or retain rights own. In addition to construct and operate on the properties we do not own on reasonable financial and other terms, we could lose our rights to occupy risks associated with such property ownership and use these properties and the related facilities, which could delay or derail proposed projects, increase our development costs, and result in breaches of one or more permits or contracts related to the affected facilities that could lead we describe above under “Risks Related to legal costs, fines or penalties. In addition, All Sempra Businesses – Operational Risks,” disputes regarding any of these properties could lead to difficulties finding or maintaining suitable partners, customers and project financing arrangements and could hinder or halt our ability to construct and, if completed, operate the affected facilities or proposed projects. Any of these outcomes could have a material adverse effect on our results of operations, financial condition, cash flows and/or prospects. Sempra Infrastructure’s energy infrastructure assets may be considered by the Mexican government to be a public service or essential for the provision of a public service, in which case these assets and the related businesses could be subject to expropriation or nationalization, loss of concessions, renegotiation or annulment of existing contracts, and other similar risks. Any such occurrence could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Added · Removed · word-level comparison of the two filings

Removed this year

Risk factors in the 2022 10-K with no counterpart in this one. Shown as they read last year.

removed Hydraulic fracturing is subject to political, economic and other uncertainties.

Regulatory · Removed hydraulic fracturing risk factor addressing state permitting requirements, local drilling restrictions, and potential federal regulation affecting LNG export demand and viability.

Last year’s text

Domestic and international hydraulic fracturing operations face political and economic risks and uncertainties. Several states have imposed or are considering imposing more stringent permitting, public disclosure and well construction requirements, and some local municipalities have adopted or are considering adopting land use restrictions that may restrict or prohibit well drilling in general and/or hydraulic fracturing in particular. We cannot predict whether additional federal, state, local or international laws or regulations applicable to hydraulic fracturing will be enacted and, if so, what actions any such laws or regulations would require or prohibit. The current U.S. Administration may have a negative view of hydraulic fracturing, which could increase the risk of regulation that negatively affects these operations. If additional regulation or permitting requirements are imposed on domestic hydraulic fracturing operations, natural gas prices in North America could rise and the relative pricing advantage in favor of domestic natural gas could decline, which could materially adversely affect demand for LNG exports and our ability to develop commercially viable LNG export facilities beyond Cameron LNG JV Phase 1 and ECA LNG Phase 1 (which are fully contracted). Any such occurrence could materially adversely affect our results of operations, financial condition, cash flows and/or prospects.

Mentions · how they’re counted

CategoryUnderlinedWord counterModel’s count
AI

AI, artificial intelligence, generative AI, machine learning, large language model, LLM

0——
Layoffs

layoffs, RIF, headcount reduction, workforce optimization, restructuring

0——
Recession

recession, downturn, contraction, slowdown

1——
Tariffs

tariff, trade war, trade barriers, trade restrictions, trade policy

11——
Buybacks

share repurchase, buyback program

1——

Underlines use the same word lists the scores use. AI, recession and tariffs follow Palanor’s word counter, so those counts match it exactly on the same text. Layoffs and buybacks use the terms the model was given. The model’s count is an estimate by meaning, not by string, so it can differ from the underlines. This view is built from the parsed risk factors, so it can differ slightly from the section text the counts were taken on.

Source: SEC EDGAR · public domain · Highlights by Palanor